Assessment Year | 2011 |
---|---|
Principal Product | automotive parts |
NAICS | 336330: Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $50 M to 100M |
# of Employees | 204 |
Plant Area |
148,500
ft2
|
Annual Production | 8,200,000
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $409,954 | 7,795,454 |
kWh
|
$0.053 |
Electricity Demand | $220,892 | 14,850 |
kW-mo/yr
|
$14.87 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $102,389 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,841 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,193 | $640 |
$2,211
41,913
kWh
|
$982
-
kW-mo/yr
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,648 | $2,500 |
$6,051
114,709
kWh
|
$2,597
-
kW-mo/yr
|
|
03 | 2.7232: Replace existing hvac unit with high efficiency model | $68,973 | $399,000 |
$44,573
841,000
kWh
|
$24,400
-
kW-mo/yr
|
|
04 | 2.7232: Replace existing hvac unit with high efficiency model | $5,673 | $29,278 |
$3,143
59,300
kWh
|
$2,530
-
kW-mo/yr
|
|
05 | 2.7231: Use radiant heater for spot heating | $10,002 | $14,840 |
$2,057
39,000
kWh
|
$7,945
-
kW-mo/yr
|
|
06 | 2.7135: Install occupancy sensors | $2,017 | $2,280 |
$2,017
38,234
kWh
|
- | |
07 | 2.7122: Disconnect ballasts | $3,883 | $2,310 |
$3,883
52,519
kWh
|
- | |
TOTAL RECOMMENDED | $102,389 | $450,848 |
$63,935
1,186,675
kWh
|
$38,454
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $11,841 | $3,140 |
$8,262
156,622
kWh
|
$3,579
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs