Assessment Year | 2014 |
---|---|
Principal Product | School buses |
NAICS | 336120: Heavy Duty Truck Manufacturing |
SIC | 3711: Motor Vehicles and Passenger Car Bodies |
Sales Range | $10 M to 50M |
# of Employees | 1,300 |
Plant Area |
535,738
ft2
|
Annual Production | 3,000
pieces
|
Production Hrs. Annual | 5,225
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $992,329 | 17,386,000 |
kWh
|
$0.057 |
Electricity Demand | $172,505 | 38,944 |
kW-mo/yr
|
$4.43 |
Natural Gas | $591,968 | 83,073 |
MMBtu
|
$7.13 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $205,627 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $151,086 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $101,147 | $140,860 |
$65,178
1,143,470
kWh
|
$11,634
-
kW-mo/yr
|
- | - | $24,335 | |
02 | 2.7124: Make a practice of turning off lights when not needed | $23,485 | $5,000 |
$24,735
433,951
kWh
|
- | - | $(-1,250.0) | - | |
03 | 2.1224: Replace boiler | $32,235 | $90,000 | - | - |
$32,235
-
MMBtu
|
- | - | |
04 | 2.4226: Use / purchase optimum sized compressor | $9,800 | $33,000 |
$6,786
119,061
kWh
|
$3,014
-
kW-mo/yr
|
- | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,403 | $100 |
$7,198
126,290
kWh
|
$1,285
-
kW-mo/yr
|
- | $(-600.0) | $(-480.0) | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $8,883 | $10,000 |
$7,538
132,244
kWh
|
$1,345
-
kW-mo/yr
|
- | - | - | |
07 | 2.2437: Recover waste heat from equipment | $13,647 | $10,000 | - | - |
$13,647
-
MMBtu
|
- | - | |
08 | 2.4239: Eliminate or reduce compressed air usage | $1,785 | $300 |
$1,785
31,324
kWh
|
- | - | - | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,636 | $1,503 |
$2,394
41,993
kWh
|
$427
-
kW-mo/yr
|
- | - | $815 | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $945 | $432 |
$392
6,885
kWh
|
$71
-
kW-mo/yr
|
- | - | $482 | |
11 | 2.4151: Develop a repair/replace policy | $1,768 | $4,256 |
$1,500
26,318
kWh
|
$268
-
kW-mo/yr
|
- | - | - | |
12 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $893 | $180 |
$758
13,290
kWh
|
$135
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $205,627 | $295,631 |
$118,264
2,074,826
kWh
|
$18,179
-
kW-mo/yr
|
$45,882
-
MMBtu
|
$(-1,850.0) | $25,152 | ||
TOTAL IMPLEMENTED | $151,086 | $161,719 |
$101,005
1,772,022
kWh
|
$13,614
-
kW-mo/yr
|
$13,647
-
MMBtu
|
$(-1,850.0) | $24,670 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs