Assessment Year | 1996 |
---|---|
Principal Product | Zinc Die Cast Building Hardware |
NAICS |
n/a
|
SIC | 3363: Aluminum Die-Castings |
Sales Range | $5 M to 10M |
# of Employees | 90 |
Plant Area |
43,000
ft2
|
Annual Production | 3,000,000
lb
|
Production Hrs. Annual | 4,080
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $31,384 | 1,300,410 |
kWh
|
$0.024 |
Electricity Demand | $50,148 | 3,621 |
kW-mo/yr
|
$13.85 |
Electricity Fees | $2,241 | - |
|
- |
Natural Gas | $85,970 | 15,753 |
MMBtu
|
$5.46 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $17,307 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,171 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (haz) Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.8113: Purchase gas directly from a contract gas supplier | $7,245 | - | - | - |
$7,245
-
MMBtu
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,408 | $1,135 |
$527
22,567
kWh
|
$881
-
kW-mo/yr
|
- | - | - | |
03 | 2.7261: Install timers and/or thermostats | $3,548 | $1,755 | - | - |
$3,548
-
MMBtu
|
- | - | |
04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $670 | $360 | - | - |
$670
-
MMBtu
|
- | - | |
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,041 | $815 | - | - |
$1,041
-
MMBtu
|
- | - | |
06 | 3.4116: Meter recycled water (to reduce sewer charges) | $2,300 | $1,105 | - | - | - |
$2,300
-
Tgal
|
- | |
07 | 3.8211: Convert to aqueous cleaning system | $1,095 | $650 | - | - | - | - |
$1,095
-
gal
|
|
TOTAL RECOMMENDED | $17,307 | $5,820 |
$527
22,567
kWh
|
$881
-
kW-mo/yr
|
$12,504
-
MMBtu
|
$2,300
-
Tgal
|
$1,095
-
gal
|
||
TOTAL IMPLEMENTED | $15,171 | $4,355 |
$527
22,567
kWh
|
$881
-
kW-mo/yr
|
$11,463
-
MMBtu
|
$2,300
-
Tgal
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs