ITAC Assessment: KU0346
ITAC logo
ITAC Assessment: KU0346
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product TRAVEL TRIALERS
NAICS
n/a
SIC 3792: Travel Trailers and Campers
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 1,300
pieces
Production Hrs. Annual 2,134
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,898 1,185,522
kWh
Natural Gas $34,751 9,189
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,595 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,595

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $2,719 $500 $889
15,533
kWh
$1,830
-
MMBtu
02 2.6212: Turn off equipment during breaks, reduce operating time $1,121 $200 $168
2,931
kWh
$953
-
MMBtu
03 2.7221: Lower temperature during the winter season and vice-versa $1,943 - - $1,943
-
MMBtu
04 2.2437: Recover waste heat from equipment $197 $250 - $197
-
MMBtu
05 2.6232: Install set-back timers $1,059 $100 $1,059
18,464
kWh
-
06 2.7121: Utilize daylight whenever possible in lieu of artificial light $470 $825 $470
8,206
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $121 $109 $121
2,052
kWh
-
08 2.4221: Install compressor air intakes in coolest locations $453 $100 $453
7,913
kWh
-
09 2.1311: Replace electrically-operated equipment with fossil fuel equipment $311 - $436
7,620
kWh
$(-125.0)
-
MMBtu
10 2.6121: Reduce hot water temperature to the minimum required $201 - $201
3,517
kWh
-
TOTAL RECOMMENDED $8,595 $2,084 $3,797
66,236
kWh
$4,798
-
MMBtu
TOTAL IMPLEMENTED $8,595 $2,084 $3,797
66,236
kWh
$4,798
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs