ITAC Assessment: SF0264
ITAC logo
ITAC Assessment: SF0264
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Wines
NAICS 312130: Wineries
SIC 2084: Wines, Brandy, and Brandy Spirits
Sales Range $50
M
to 100
M
# of Employees 100
Plant Area 187,308
ft2
Annual Production 0
units
Production Hrs. Annual 2,600
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $540,645 4,886,517
kWh
Electricity Demand $151,557 12,969
kW-mo/yr
Natural Gas $50,647 8,555
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $220,789 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $68,639

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $34,947 $18,680 $24,097
214,530
kWh
$10,850
-
kW-mo/yr
- - - -
02 2.7134: Use photocell controls $1,323 $960 $519
4,661
kWh
$804
-
kW-mo/yr
- - - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $768 $609 $646
5,806
kWh
$122
-
kW-mo/yr
- - - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,123 $17,490 $12,148
109,244
kWh
$1,975
-
kW-mo/yr
- - - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,098 $7,305 $2,818
20,541
kWh
$280
-
kW-mo/yr
- - - -
06 2.7135: Install occupancy sensors $1,307 $3,200 $1,113
8,113
kWh
$194
-
kW-mo/yr
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $4,167 $16,382 $3,362
30,233
kWh
$805
-
kW-mo/yr
- - - -
08 2.7134: Use photocell controls $419 $2,640 $419
3,772
kWh
- - - - -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,660 - $(-214.0)
(-1,920)
kWh
$(-106.0)
-
kW-mo/yr
$(-102.0) - $14,082 -
10 3.2172: Use automatic cleaning equipment $2,169 $5,391 - - - - - $2,169
-
Tgal
11 3.1161: Eliminate/reduce an operation $3,120 $2,865 - - $3,120 - - -
12 2.3212: Optimize plant power factor $1,997 $2,695 - $1,997
-
kW-mo/yr
- - - -
13 2.8114: Change rate schedules or other changes in utility service $90,568 $162,300 - - - $90,568 - -
14 4.212: Adopt in-house material generation $49,123 $105,624 $(-19,938.0)
(-179,297)
kWh
$(-3,241.0)
-
kW-mo/yr
- - $72,302 -
TOTAL RECOMMENDED $220,789 $346,141 $24,970
215,683
kWh
$13,680
-
kW-mo/yr
$3,018 $90,568 $86,384 $2,169
-
Tgal
TOTAL IMPLEMENTED $68,639 $56,152 $40,331
360,520
kWh
$14,328
-
kW-mo/yr
$(-102.0) - $14,082 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs