ITAC Assessment: NV0089
ITAC logo
ITAC Assessment: NV0089
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Plastic Trays
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 40,000
ft2
Annual Production 4,000,000
lb
Production Hrs. Annual 6,365
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $110,379 2,471,571
kWh
Electricity Demand $51,934 8,775
kW-mo/yr
Electricity Fees $1,244 -
Natural Gas $12,423 2,730
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,851 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
01 2.7111: Reduce illumination to minimum necessary levels $10,737 $650 n/a $8,592
192,263
kWh
$2,145
-
kW-mo/yr
- - - -
02 2.7135: Install occupancy sensors $752 $246 n/a $639
14,361
kWh
$113
-
kW-mo/yr
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,686 $946 n/a $3,735
83,529
kWh
$951
-
kW-mo/yr
- - - -
04 2.3414: Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat $8,425 $815 n/a - - - $8,425
-
MMBtu
- -
05 2.4221: Install compressor air intakes in coolest locations $483 $250 n/a $483
10,844
kWh
- - - - -
06 2.4133: Use most efficient type of electric motors $967 $824 n/a $774
17,292
kWh
$193
-
kW-mo/yr
- - - -
07 2.7261: Install timers and/or thermostats $240 $180 n/a $64
1,465
kWh
- - $176
-
MMBtu
- -
08 2.3212: Optimize plant power factor $356 $1,047 n/a - - $356 - - -
09 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $3,890 $840 n/a $3,110
69,461
kWh
$780
-
kW-mo/yr
- - - -
10 3.5315: Lease / purchase baler; sell cardboard to recycler $3,804 - n/a - - - - - $3,804
11 3.4116: Meter recycled water (to reduce sewer charges) $300 $120 n/a - - - - $300
-
Tgal
-
12 2.3132: Recharge batteries on during off-peak demand periods $211 $50 n/a - - - - - $211
TOTAL RECOMMENDED $34,851 $5,968 $17,397
389,215
kWh
$4,182
-
kW-mo/yr
$356 $8,601
-
MMBtu
$300
-
Tgal
$4,015
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs