ITAC Assessment: NV0078
ITAC logo
ITAC Assessment: NV0078
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Precison Sheet Metal
NAICS
n/a
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 84,000
ft2
Annual Production 3,000,000
lb
Production Hrs. Annual 5,824
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,499 1,271,981
kWh
Electricity Demand $25,691 2,736
kW-mo/yr
Electricity Fees $2,056 -
Natural Gas $31,131 6,133
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $188,225 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $115,275

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $878 $54 $321
7,327
kWh
$113
-
kW-mo/yr
$444 - - -
02 2.7261: Install timers and/or thermostats $7,471 $2,850 - - - $7,471
-
MMBtu
- -
03 2.7135: Install occupancy sensors $146 $186 $101
2,345
kWh
$45
-
kW-mo/yr
- - - -
04 2.4221: Install compressor air intakes in coolest locations $310 $360 $186
6,448
kWh
$124
-
kW-mo/yr
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $691 $70 $398
9,086
kWh
$293
-
kW-mo/yr
- - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,156 $400 $1,156
26,377
kWh
- - - - -
07 2.2531: Re-size charging openings or add movable cover or door $645 $589 - - - $645
-
MMBtu
- -
08 4.322: Eliminate old stock and modify inventory control $111,690 $110,000 - - - - - $111,690
09 4.212: Adopt in-house material generation $60,000 $50,000 - - - - - $60,000
10 4.821: Pay bills on time to avoid late fees $438 - - - - - - $438
11 3.5311: Recover and reuse waste material $3,600 $300 - - - - $3,600
-
lb
-
12 3.5311: Recover and reuse waste material $1,200 - - - - - $1,200
-
lb
-
TOTAL RECOMMENDED $188,225 $164,809 $2,162
51,583
kWh
$575
-
kW-mo/yr
$444 $8,116
-
MMBtu
$4,800
-
lb
$172,128
TOTAL IMPLEMENTED $115,275 $111,175 $1,257
28,722
kWh
$45
-
kW-mo/yr
- $645
-
MMBtu
$1,200
-
lb
$112,128
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs