Assessment Year | 1995 |
---|---|
Principal Product | Fasteners |
NAICS |
n/a
|
SIC | 3452: Bolts, Nuts, Screws, Rivets, and Washers |
Sales Range | $10 M to 50M |
# of Employees | 300 |
Plant Area |
200,000
ft2
|
Annual Production | 2,000,000,000
pieces
|
Production Hrs. Annual | 5,200
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $668,014 | 5,925,264 |
kWh
|
$0.11 |
Natural Gas | $8,108 | 857 |
MMBtu
|
$9.46 |
Fuel Oil #6 | $62,710 | 20,545 |
MMBtu
|
$3.05 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $23,369 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,517 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Other Liquid (haz) Savings |
---|---|---|---|---|---|---|
01 | 2.7131: Add area lighting switches | $2,534 | $200 |
$2,534
22,567
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,424 | $10,340 |
$8,424
74,736
kWh
|
- | |
03 | 2.4133: Use most efficient type of electric motors | $752 | $1,492 |
$752
6,741
kWh
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $4,559 | $600 |
$4,559
40,445
kWh
|
- | |
05 | 3.6124: Burn waste oil for heat | $7,100 | $1,500 | - |
$7,100
-
gal
|
|
TOTAL RECOMMENDED | $23,369 | $14,132 |
$16,269
144,489
kWh
|
$7,100
-
gal
|
||
TOTAL IMPLEMENTED | $15,517 | $11,140 |
$15,517
137,748
kWh
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs