ITAC Assessment: NV0028
ITAC logo
ITAC Assessment: NV0028
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Fabricated Metal Products
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 208
Plant Area 160,000
ft2
Annual Production 26,000,000
lb
Production Hrs. Annual 6,794
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $127,280 1,748,828
kWh
Natural Gas $56,975 11,410
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,367 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,309

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $1,290 $543 $1,290
17,878
kWh
-
02 2.3212: Optimize plant power factor $665 $2,154 $665
-
kWh
-
03 2.7243: Improve air circulation with destratification fans / other methods $15,874 $13,000 - $15,874
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $1,519 $240 $1,519
20,809
kWh
-
05 2.7442: Keep doors and windows shut when not on use $6,854 $4,119 - $6,854
-
MMBtu
06 2.4231: Reduce the pressure of compressed air to the minimum required $165 - $165
2,345
kWh
-
TOTAL RECOMMENDED $26,367 $20,056 $3,639
41,032
kWh
$22,728
-
MMBtu
TOTAL IMPLEMENTED $8,309 $4,662 $1,455
20,223
kWh
$6,854
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs