ITAC Assessment: NV0027
ITAC logo
ITAC Assessment: NV0027
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Slurry Valves and Feeders
NAICS
n/a
SIC 3494: Valves and Pipe Fittings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 47,000
ft2
Annual Production 5,190
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,788 1,057,444
kWh
Natural Gas $19,282 3,092
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,462 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,446

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $3,606 - $3,606
46,600
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,365 $615 $1,365
17,585
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $589 $200 $589
7,620
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $1,566 $250 $1,566
20,223
kWh
-
05 2.7447: Install vinyl strip / high speed / air curtain doors $886 $1,415 - $886
-
MMBtu
06 2.2122: Install / repair insulation on condensate lines $605 $112 - $605
-
MMBtu
07 2.7226: Use computer programs to optimize hvac performance $2,845 $1,900 - $2,845
-
MMBtu
TOTAL RECOMMENDED $11,462 $4,492 $7,126
92,028
kWh
$4,336
-
MMBtu
TOTAL IMPLEMENTED $6,446 $2,230 $5,560
71,805
kWh
$886
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs