Assessment Year | 1996 |
---|---|
Principal Product | Aluminum Billets |
NAICS |
n/a
|
SIC | 3354: Aluminum Extruded Products |
Sales Range | $10 M to 50M |
# of Employees | 50 |
Plant Area |
100,000
ft2
|
Annual Production | 84,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $582,823 | 32,412,662 |
kWh
|
$0.018 |
Electricity Demand | $495,726 | 116,988 |
kW-mo/yr
|
$4.24 |
Natural Gas | $277,511 | 110,452 |
MMBtu
|
$2.51 |
LPG | $5,466 | 1,072 |
MMBtu
|
$5.10 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $244,064 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $195,168 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.3191: Use demand controller or load shedder | $195,168 | - |
$91,728
4,369,285
kWh
|
$103,440
-
kW-mo/yr
|
- | - | - | |
02 | 2.1116: Improve combustion control capability | $13,394 | - | - | - |
$13,394
-
MMBtu
|
- | - | |
03 | 2.4311: Recover mechanical energy | $2,710 | - |
$2,710
81,477
kWh
|
- | - | - | - | |
04 | 2.2447: Heat water with exhaust heat | $9,179 | $27,349 |
$(-4,374.0)
(-131,301)
kWh
|
$(-776.0)
-
kW-mo/yr
|
$14,329
-
MMBtu
|
- | - | |
05 | 2.4133: Use most efficient type of electric motors | $1,737 | $2,317 |
$1,535
71,512
kWh
|
$202
-
kW-mo/yr
|
- | - | - | |
06 | 2.2414: Use waste heat from hot flue gases to preheat | $16,129 | $30,000 | - | - |
$16,129
-
MMBtu
|
- | - | |
07 | 2.1332: Convert combustion equipment to burn natural gas | $3,065 | $9,720 |
$(-112.0)
(-3,517)
kWh
|
$(-40.0)
-
kW-mo/yr
|
$(-2,249.0)
-
MMBtu
|
$5,466
-
MMBtu
|
- | |
08 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $2,682 | - | - | - | - | - |
$2,682
-
lb
|
|
TOTAL RECOMMENDED | $244,064 | $69,386 |
$91,487
4,387,456
kWh
|
$102,826
-
kW-mo/yr
|
$41,603
-
MMBtu
|
$5,466
-
MMBtu
|
$2,682
-
lb
|
||
TOTAL IMPLEMENTED | $195,168 | - |
$91,728
4,369,285
kWh
|
$103,440
-
kW-mo/yr
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs