Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product METAL FINISHING
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 64,000
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $196,955 4,171,597
kWh
Natural Gas $157,806 30,862
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,742 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,371

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Consumption Savings
01 2.8114: Change rate schedules or other changes in utility service $8,200 - - - $8,200 - -
02 2.6231: Utilize controls to operate equipment only when needed $1,135 $2,700 $1,135
42,419
kWh
- - - -
03 2.2121: Increase amount of condensate returned $7,977 $2,500 - - - $5,752
-
MMBtu
$2,225
-
Tgal
04 2.2511: Insulate bare equipment $164 $300 $164
6,132
kWh
- - - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $904 $1,549 $904
33,781
kWh
- - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $290 $200 $290
11,023
kWh
- - - -
07 2.4131: Size electric motors for peak operating efficiency $27,072 $3,660 $25,753
962,724
kWh
$1,319
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $45,742 $10,909 $28,246
1,056,079
kWh
$1,319
-
kW-mo/yr
$8,200 $5,752
-
MMBtu
$2,225
-
Tgal
TOTAL IMPLEMENTED $17,371 $4,249 $1,194
44,804
kWh
- $8,200 $5,752
-
MMBtu
$2,225
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs