ITAC Assessment: NT0002
ITAC logo
ITAC Assessment: NT0002
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product metal stamping products
NAICS 336370: Motor Vehicle Metal Stamping
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 80,000
ft2
Annual Production 16,594,601
units
Production Hrs. Annual 5,200
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $169,883 2,159,800
kWh
Electricity Demand $66,666 6,666
kW-mo/yr
Electricity Fees $2,400 -
Natural Gas $2,328 153
MMBtu
Waste Disposal Costs
Water Usage $10,183 933
Tgal
TOTAL YEARLY COSTS $251,461
RECOMMENDED SAVINGS* $136,151 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,455

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,414 $5,801 $7,265
93,137
kWh
$2,149
-
kW-mo/yr
-
02 2.3212: Optimize plant power factor $14,389 $21,853 - $14,389
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,026 $2,499 $599
7,679
kWh
$427
-
kW-mo/yr
-
04 2.6232: Install set-back timers $1,504 - $1,504
19,284
kWh
- -
05 3.1161: Eliminate/reduce an operation $9,631 - $7,432
95,280
kWh
$2,199
-
kW-mo/yr
-
06 4.446: Automate finishing process $96,307 $111,000 - - $96,307
07 2.7425: Clean or color roof to reduce solar load $3,880 $7,474 $2,240
28,718
kWh
$1,640
-
kW-mo/yr
-
TOTAL RECOMMENDED $136,151 $148,627 $19,040
244,098
kWh
$20,805
-
kW-mo/yr
$96,307
TOTAL IMPLEMENTED $25,455 $15,774 $19,040
244,098
kWh
$6,415
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs