| Assessment Year | 2023 |
|---|---|
| Principal Product | metal stamping products |
| NAICS | 336370: Motor Vehicle Metal Stamping |
| SIC | 3469: Metal Stampings, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
80,000
ft2
|
| Annual Production | 16,594,601
units
|
| Production Hrs. Annual | 5,200
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $169,883 | 2,159,800 |
kWh
|
$0.079 | |
| Electricity Demand | $66,666 | 6,666 |
kW-mo/yr
|
$10.00 | |
| Electricity Fees | $2,400 | - |
|
- | |
| Natural Gas | $2,328 | 153 |
MMBtu
|
$15.20 | |
| Waste Disposal Costs | |||||
| Water Usage | $10,183 | 933 |
Tgal
|
$10.91 | |
| TOTAL YEARLY COSTS | $251,461 | ||||
| RECOMMENDED SAVINGS* | $136,151 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $25,455 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,414 | $5,801 |
$7,265
93,137
kWh
|
$2,149
-
kW-mo/yr
|
- | |
| 02 | 2.3212: Optimize plant power factor | $14,389 | $21,853 | - |
$14,389
-
kW-mo/yr
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,026 | $2,499 |
$599
7,679
kWh
|
$427
-
kW-mo/yr
|
- | |
| 04 | 2.6232: Install set-back timers | $1,504 | - |
$1,504
19,284
kWh
|
- | - | |
| 05 | 3.1161: Eliminate/reduce an operation | $9,631 | - |
$7,432
95,280
kWh
|
$2,199
-
kW-mo/yr
|
- | |
| 06 | 4.446: Automate finishing process | $96,307 | $111,000 | - | - | $96,307 | |
| 07 | 2.7425: Clean or color roof to reduce solar load | $3,880 | $7,474 |
$2,240
28,718
kWh
|
$1,640
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $136,151 | $148,627 |
$19,040
244,098
kWh
|
$20,805
-
kW-mo/yr
|
$96,307 | ||
| TOTAL IMPLEMENTED | $25,455 | $15,774 |
$19,040
244,098
kWh
|
$6,415
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs