Assessment Year | 1996 |
---|---|
Principal Product | Corrugated Roofing and Siding Panels |
NAICS |
n/a
|
SIC | 3444: Sheet Metal Work |
Sales Range | n/a |
# of Employees | 34 |
Plant Area |
93,200
ft2
|
Annual Production | 45,000,000
lb
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $54,754 | 1,105,510 |
kWh
|
$0.050 |
Electricity Demand | $37,503 | 4,448 |
kW-mo/yr
|
$8.43 |
Electricity Fees | $9,428 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $22,863 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,772 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $15,772 | $17,505 |
$20,150
429,660
kWh
|
$9,352
-
kW-mo/yr
|
$(-13,730.0)
-
MMBtu
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,463 | $5,801 |
$1,241
26,377
kWh
|
$1,222
-
kW-mo/yr
|
- | - | |
03 | 2.4133: Use most efficient type of electric motors | $1,346 | $4,140 |
$668
14,361
kWh
|
$678
-
kW-mo/yr
|
- | - | |
04 | 2.7135: Install occupancy sensors | $450 | $375 |
$231
4,982
kWh
|
$219
-
kW-mo/yr
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $353 | $300 |
$228
4,982
kWh
|
$125
-
kW-mo/yr
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $319 | $504 |
$256
5,569
kWh
|
$63
-
kW-mo/yr
|
- | - | |
07 | 3.5316: Contract a wood pallet recycling company | $2,160 | $370 | - | - | - | $2,160 | |
TOTAL RECOMMENDED | $22,863 | $28,995 |
$22,774
485,931
kWh
|
$11,659
-
kW-mo/yr
|
$(-13,730.0)
-
MMBtu
|
$2,160 | ||
TOTAL IMPLEMENTED | $6,772 | $10,986 |
$2,368
50,702
kWh
|
$2,244
-
kW-mo/yr
|
- | $2,160 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs