Assessment Year | 1999 |
---|---|
Principal Product | Food products |
NAICS |
n/a
|
SIC | 2099: Food Preparations, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 150 |
Plant Area |
120,000
ft2
|
Annual Production | 58,000,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $200,995 | 3,632,767 |
kWh
|
$0.055 |
Electricity Demand | $101,626 | 7,641 |
kW-mo/yr
|
$13.30 |
Natural Gas | $55,384 | 13,696 |
MMBtu
|
$4.04 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $56,183 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,813 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,813 | $4,697 |
$994
17,878
kWh
|
$819
-
kW-mo/yr
|
- | - | |
02 | 2.7144: Install spectral reflectors / delamp | $1,888 | $2,790 |
$1,035
18,757
kWh
|
$853
-
kW-mo/yr
|
- | - | |
03 | 2.2414: Use waste heat from hot flue gases to preheat | $2,584 | $6,000 | - | - |
$2,584
-
MMBtu
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,823 | $19,600 |
$3,787
68,288
kWh
|
$3,036
-
kW-mo/yr
|
- | - | |
05 | 2.2612: Use cooling tower water instead of refrigeration | $7,799 | $11,000 |
$5,764
108,148
kWh
|
$2,035
-
kW-mo/yr
|
- | - | |
06 | 2.4131: Size electric motors for peak operating efficiency | $24,876 | $14,300 |
$13,465
242,673
kWh
|
$11,411
-
kW-mo/yr
|
- | - | |
07 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $10,400 | $10,000 | - | - | - | $10,400 | |
TOTAL RECOMMENDED | $56,183 | $68,387 |
$25,045
455,744
kWh
|
$18,154
-
kW-mo/yr
|
$2,584
-
MMBtu
|
$10,400 | ||
TOTAL IMPLEMENTED | $1,813 | $4,697 |
$994
17,878
kWh
|
$819
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs