ITAC Assessment: NT0022
ITAC logo
ITAC Assessment: NT0022
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Metal Cans
NAICS 332431: Metal Can Manufacturing
SIC 3411: Metal Cans
Sales Range $100
M
to 500
M
# of Employees 96
Plant Area 249,000
ft2
Annual Production 464,866,514
units
Production Hrs. Annual 8,760
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,102,300 14,298,000
kWh
Electricity Fees $46,718 -
Natural Gas $71,296 2,023
MMBtu
Waste Disposal Costs
Water Usage $32,562 32,283
Tgal
TOTAL YEARLY COSTS $1,252,876
RECOMMENDED SAVINGS* $87,681 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,989 $2,640 $10,989
142,535
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $4,667 - $4,667
60,536
kWh
-
03 4.812: Apply for investment incentives $51,120 - - $51,120
04 2.7425: Clean or color roof to reduce solar load $20,667 $46,524 $20,667
268,054
kWh
-
05 2.7221: Lower temperature during the winter season and vice-versa $237 - $237
3,076
kWh
-
TOTAL RECOMMENDED $87,681 $49,164 $36,561
474,201
kWh
$51,120
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs