| Assessment Year | 2023 |
|---|---|
| Principal Product | Industrial components |
| NAICS | 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing |
| SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 350 |
| Plant Area |
140,000
ft2
|
| Annual Production | 1,500,000
units
|
| Production Hrs. Annual | 4,080
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $222,348 | 2,646,480 |
kWh
|
$0.084 | |
| Electricity Demand | $27,112 | 5,672 |
kW-mo/yr
|
$4.78 | |
| Electricity Fees | $7,278 | - |
|
- | |
| Natural Gas | $263,262 | 31,163 |
MMBtu
|
$8.45 | |
| Waste Disposal Costs | |||||
| Water Usage | $64,915 | 14,461 |
Tgal
|
$4.49 | |
| Water Disposal | $79,043 | 14,461 |
Tgal
|
$5.47 | |
| TOTAL YEARLY COSTS | $663,959 | ||||
| RECOMMENDED SAVINGS* | $59,474 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $40,026 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,144 | $5,801 |
$6,976
83,049
kWh
|
$1,168
-
kW-mo/yr
|
- | |
| 02 | 2.4224: Upgrade controls on compressors | $16,452 | $9,984 |
$16,452
195,854
kWh
|
- | - | |
| 03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $8,130 | $1,258 | - | - |
$8,130
-
MMBtu
|
|
| 04 | 2.2414: Use waste heat from hot flue gases to preheat | $19,448 | $9,020 | - | - |
$19,448
-
MMBtu
|
|
| 05 | 2.6232: Install set-back timers | $883 | - |
$325
3,871
kWh
|
- |
$558
-
MMBtu
|
|
| 06 | 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads | $2,710 | - |
$1,391
16,560
kWh
|
$1,319
-
kW-mo/yr
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,707 | $6,472 |
$3,707
44,126
kWh
|
- | - | |
| TOTAL RECOMMENDED | $59,474 | $32,535 |
$28,851
343,460
kWh
|
$2,487
-
kW-mo/yr
|
$28,136
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $40,026 | $23,515 |
$28,851
343,460
kWh
|
$2,487
-
kW-mo/yr
|
$8,688
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs