ITAC Assessment: NT0001
ITAC logo
ITAC Assessment: NT0001
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Industrial components
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 140,000
ft2
Annual Production 1,500,000
units
Production Hrs. Annual 4,080
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $222,348 2,646,480
kWh
Electricity Demand $27,112 5,672
kW-mo/yr
Electricity Fees $7,278 -
Natural Gas $263,262 31,163
MMBtu
Waste Disposal Costs
Water Usage $64,915 14,461
Tgal
Water Disposal $79,043 14,461
Tgal
TOTAL YEARLY COSTS $663,959
RECOMMENDED SAVINGS* $59,474 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,026

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,144 $5,801 $6,976
83,049
kWh
$1,168
-
kW-mo/yr
-
02 2.4224: Upgrade controls on compressors $16,452 $9,984 $16,452
195,854
kWh
- -
03 2.1233: Analyze flue gas for proper air/fuel ratio $8,130 $1,258 - - $8,130
-
MMBtu
04 2.2414: Use waste heat from hot flue gases to preheat $19,448 $9,020 - - $19,448
-
MMBtu
05 2.6232: Install set-back timers $883 - $325
3,871
kWh
- $558
-
MMBtu
06 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $2,710 - $1,391
16,560
kWh
$1,319
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $3,707 $6,472 $3,707
44,126
kWh
- -
TOTAL RECOMMENDED $59,474 $32,535 $28,851
343,460
kWh
$2,487
-
kW-mo/yr
$28,136
-
MMBtu
TOTAL IMPLEMENTED $40,026 $23,515 $28,851
343,460
kWh
$2,487
-
kW-mo/yr
$8,688
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs