| Assessment Year | 1996 |
|---|---|
| Principal Product | Pipe Fittings |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 90 |
| Plant Area |
65,000
ft2
|
| Annual Production | 1,500,000
lb
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Iowa |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $103,120 | 3,495,604 |
kWh
|
$0.029 |
| Electricity Demand | $34,062 | 7,932 |
kW-mo/yr
|
$4.29 |
| Natural Gas | $3,175 | 617 |
MMBtu
|
$5.15 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $127,521 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $19,996 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $11,803 | $7,955 |
$9,151
310,082
kWh
|
$2,652
-
kW-mo/yr
|
- | |
| 02 | 2.7111: Reduce illumination to minimum necessary levels | $4,117 | $2,710 |
$3,194
73,857
kWh
|
$923
-
kW-mo/yr
|
- | |
| 03 | 2.2511: Insulate bare equipment | $1,352 | $6,338 |
$1,048
35,463
kWh
|
$304
-
kW-mo/yr
|
- | |
| 04 | 2.4239: Eliminate or reduce compressed air usage | $1,468 | $2,301 |
$929
31,653
kWh
|
$539
-
kW-mo/yr
|
- | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $526 | $620 |
$415
14,068
kWh
|
$111
-
kW-mo/yr
|
- | |
| 06 | 4.321: Optimize production lot sizes and inventories | $105,000 | $142,000 | - | - |
$105,000
-
lb
|
|
| 07 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $2,525 | $600 | - | - |
$2,525
-
lb
|
|
| 08 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $730 | - | - | - |
$730
-
lb
|
|
| TOTAL RECOMMENDED | $127,521 | $162,524 |
$14,737
465,123
kWh
|
$4,529
-
kW-mo/yr
|
$108,255
-
lb
|
||
| TOTAL IMPLEMENTED | $19,996 | $19,924 |
$14,737
465,123
kWh
|
$4,529
-
kW-mo/yr
|
$730
-
lb
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs