ITAC Assessment: NL0124
ITAC logo
ITAC Assessment: NL0124
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Custom metal tubes and pipes
NAICS 332996: Fabricated Pipe and Pipe Fitting Manufacturing
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 181,220
ft2
Annual Production 770,000
units
Production Hrs. Annual 6,032
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $77,031 3,090,976
kWh
Electricity Demand $130,621 5,772
kW-mo/yr
Electricity Fees $16,865 -
Natural Gas $10,635 1,658
MMBtu
Other Gas $3,656 1
MMBtu
Waste Disposal Costs
Water Usage $893 358
Tgal
Water Disposal $1,212 358
Tgal
Other Liquid (non-haz) $3,122 1
gal
TOTAL YEARLY COSTS $244,035
RECOMMENDED SAVINGS* $284,504 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4321: Upgrade obsolete equipment $263,952 $875,540 - - $263,952 -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $10,061 $11,592 $4,059
162,365
kWh
$5,101
-
kW-mo/yr
$901 -
03 2.7135: Install occupancy sensors $5,075 $11,340 $5,075
203,031
kWh
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,696 $1,000 $3,916
156,655
kWh
- $(-120.0) $(-100.0)
05 2.4221: Install compressor air intakes in coolest locations $1,720 $4,170 $1,720
68,720
kWh
- - -
TOTAL RECOMMENDED $284,504 $903,642 $14,770
590,771
kWh
$5,101
-
kW-mo/yr
$264,733 $(-100.0)
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs