| Assessment Year | 2026 |
|---|---|
| Principal Product | Custom metal tubes and pipes |
| NAICS | 332996: Fabricated Pipe and Pipe Fitting Manufacturing |
| SIC | 3498: Fabricated Pipe and Pipe Fittings |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
181,220
ft2
|
| Annual Production | 770,000
units
|
| Production Hrs. Annual | 6,032
hrs
|
| Location (State) | Nebraska |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $77,031 | 3,090,976 |
kWh
|
$0.025 | |
| Electricity Demand | $130,621 | 5,772 |
kW-mo/yr
|
$22.63 | |
| Electricity Fees | $16,865 | - |
|
- | |
| Natural Gas | $10,635 | 1,658 |
MMBtu
|
$6.41 | |
| Other Gas | $3,656 | 1 |
MMBtu
|
$3,656.00 | |
| Waste Disposal Costs | |||||
| Water Usage | $893 | 358 |
Tgal
|
$2.50 | |
| Water Disposal | $1,212 | 358 |
Tgal
|
$3.39 | |
| Other Liquid (non-haz) | $3,122 | 1 |
gal
|
$3,122.00 | |
| TOTAL YEARLY COSTS | $244,035 | ||||
| RECOMMENDED SAVINGS* | $284,504 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4321: Upgrade obsolete equipment | $263,952 | $875,540 | - | - | $263,952 | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,061 | $11,592 |
$4,059
162,365
kWh
|
$5,101
-
kW-mo/yr
|
$901 | - | |
| 03 | 2.7135: Install occupancy sensors | $5,075 | $11,340 |
$5,075
203,031
kWh
|
- | - | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,696 | $1,000 |
$3,916
156,655
kWh
|
- | $(-120.0) | $(-100.0) | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $1,720 | $4,170 |
$1,720
68,720
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $284,504 | $903,642 |
$14,770
590,771
kWh
|
$5,101
-
kW-mo/yr
|
$264,733 | $(-100.0) | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs