ITAC Assessment: NL0063
ITAC logo
ITAC Assessment: NL0063
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Precast Concrete
NAICS 327390: Other Concrete Product Manufacturing
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 1,450,000
ft2
Annual Production 10,503
Tgal
Production Hrs. Annual 3,120
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,840 978,584
kWh
Electricity Demand $24,205 4,499
kW-mo/yr
Electricity Fees $2,297 -
Natural Gas $65,557 17,176
MMBtu
Other Gas $29,503 1
MMBtu
Waste Disposal Costs
Water Usage $1 1
Tgal
TOTAL YEARLY COSTS $185,403
RECOMMENDED SAVINGS* $6,114 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,101 $2,000 $2,881
44,188
kWh
- $(-680.0) - $(-100.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,901 $3,265 $1,342
20,579
kWh
$429
-
kW-mo/yr
$131 - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,230 $2,400 $1,028
15,768
kWh
$181
-
kW-mo/yr
$21 - -
04 2.4221: Install compressor air intakes in coolest locations $505 $2,425 $505
7,740
kWh
- - - -
05 4.821: Pay bills on time to avoid late fees $377 $85 - - - $377 -
TOTAL RECOMMENDED $6,114 $10,175 $5,756
88,275
kWh
$609
-
kW-mo/yr
$(-528.0) $377 $(-100.0)
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs