ITAC Assessment: NL0043
ITAC logo
ITAC Assessment: NL0043
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Treated Wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $500
k
to 1
M
# of Employees 3
Plant Area 23,590
ft2
Annual Production 256,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $146,707 2,095,810
kWh
Natural Gas $8,699 1,376
MMBtu
TOTAL YEARLY COSTS $155,406
RECOMMENDED SAVINGS* $56,580 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,280

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $22,480 $37,056 $22,480
342,365
kWh
- - -
02 2.6125: Keep equipment clean $10,419 $41,591 - - - $10,419
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $15,824 $25,408 $15,824
226,058
kWh
- - -
04 2.6231: Utilize controls to operate equipment only when needed $3,551 $70 $2,790
49,824
kWh
$761
-
kW-mo/yr
- -
05 2.7231: Use radiant heater for spot heating $1,657 $2,700 $9,445
134,929
kWh
- $(-7,788.0)
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,010 $1,108 $564
8,060
kWh
- - $446
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $920 $70 - $920
-
kW-mo/yr
- -
08 2.7261: Install timers and/or thermostats $719 $135 - - $719
-
MMBtu
-
TOTAL RECOMMENDED $56,580 $108,138 $51,103
761,236
kWh
$1,681
-
kW-mo/yr
$(-7,069.0)
-
MMBtu
$10,865
TOTAL IMPLEMENTED $5,280 $1,313 $3,354
57,884
kWh
$761
-
kW-mo/yr
$719
-
MMBtu
$446
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs