ITAC Assessment: WI0002
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product BUSHINGS & CYLIN. PARTS
NAICS
n/a
SIC 3325: Steel Foundries, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 109
Plant Area
n/a
Annual Production 600,000
pieces
Production Hrs. Annual 4,165
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $127,345 2,090,563
kWh
Natural Gas $21,000 3,920
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,004 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,343

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4312: Improve lubrication practices $11,988 $3,268 $11,988
196,952
kWh
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,806 - $2,806
46,014
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,776 $3,998 $2,776
45,721
kWh
04 2.4221: Install compressor air intakes in coolest locations $118 $168 $118
2,052
kWh
05 2.3191: Use demand controller or load shedder $2,543 $3,000 $2,543
-
kWh
06 2.3212: Optimize plant power factor $5,773 $12,000 $5,773
-
kWh
TOTAL RECOMMENDED $26,004 $22,434 $26,004
290,739
kWh
TOTAL IMPLEMENTED $23,343 $19,266 $23,343
288,687
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs