ITAC Assessment: ND0364
ITAC logo
ITAC Assessment: ND0364
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product metal stampings
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 370
Plant Area 148,000
ft2
Annual Production 36,500,000
pieces
Production Hrs. Annual 7,878
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $167,090 7,369,285
kWh
Electricity Demand $142,432 14,170
kW-mo/yr
Natural Gas $92,106 23,982
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,378 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,892

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.4151: Develop a repair/replace policy $8,340 $22,377 $4,981
230,070
kWh
$3,359
-
kW-mo/yr
- - - -
02 2.7111: Reduce illumination to minimum necessary levels $3,206 - $1,808
79,719
kWh
$1,220
-
kW-mo/yr
- - $178 -
03 2.7135: Install occupancy sensors $839 $600 $494
21,688
kWh
$345
-
kW-mo/yr
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $271 $575 $52
2,052
kWh
$31
-
kW-mo/yr
- $123 $65 -
05 2.4221: Install compressor air intakes in coolest locations $3,221 $1,000 $1,924
84,701
kWh
$1,297
-
kW-mo/yr
- - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $75 $200 $75
3,224
kWh
- - - - -
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $605 $400 $198
8,792
kWh
$543
-
kW-mo/yr
$(-136.0)
-
MMBtu
- - -
08 3.4151: Minimize water usage $821 $2,875 - - - $250 $(-227.0) $798
-
Tgal
TOTAL RECOMMENDED $17,378 $28,027 $9,532
430,246
kWh
$6,795
-
kW-mo/yr
$(-136.0)
-
MMBtu
$373 $16 $798
-
Tgal
TOTAL IMPLEMENTED $11,892 $23,152 $6,916
315,065
kWh
$4,610
-
kW-mo/yr
- $123 $243 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs