ITAC Assessment: ND0355
ITAC logo
ITAC Assessment: ND0355
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Flexographic Printing
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 265
Plant Area 140,000
ft2
Annual Production 448,887
thousand feet
Production Hrs. Annual 8,760
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $205,040 6,354,045
kWh
Electricity Demand $99,013 13,237
kW-mo/yr
Natural Gas $135,827 26,880
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,624 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,705

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,537 $345 $3,537
97,304
kWh
-
02 2.4151: Develop a repair/replace policy $3,820 $8,809 $2,654
72,978
kWh
$1,166
-
kW-mo/yr
03 2.7135: Install occupancy sensors $99 $300 $75
2,052
kWh
$24
-
kW-mo/yr
04 2.4221: Install compressor air intakes in coolest locations $1,566 $300 $1,154
31,946
kWh
$412
-
kW-mo/yr
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $21,602 $15,700 $14,563
401,231
kWh
$7,039
-
kW-mo/yr
TOTAL RECOMMENDED $30,624 $25,454 $21,983
605,511
kWh
$8,641
-
kW-mo/yr
TOTAL IMPLEMENTED $26,705 $16,345 $19,254
530,481
kWh
$7,451
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs