ITAC Assessment: SF0162
ITAC logo
ITAC Assessment: SF0162
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Bleach, Chlorine
NAICS
n/a
SIC 2812: Alkalies and Chlorine
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 68,000
ft2
Annual Production 12,000
Tgal
Production Hrs. Annual 6,552
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,239 1,046,014
kWh
Electricity Demand $12,363 1,433
kW-mo/yr
Natural Gas $2,783 399
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,604 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,474

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $615 - $615
7,620
kWh
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,561 $2,700 $6,824
84,115
kWh
$737
-
kW-mo/yr
03 2.4133: Use most efficient type of electric motors $453 $291 $413
4,982
kWh
$40
-
kW-mo/yr
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,921 $3,189 $3,242
39,859
kWh
$679
-
kW-mo/yr
05 2.7135: Install occupancy sensors $1,105 $1,008 $1,006
12,309
kWh
$99
-
kW-mo/yr
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,910 $8,190 $2,641
32,532
kWh
$269
-
kW-mo/yr
07 2.7134: Use photocell controls $2,025 $6,000 $1,769
21,688
kWh
$256
-
kW-mo/yr
08 2.4231: Reduce the pressure of compressed air to the minimum required $1,014 $4,121 $905
11,137
kWh
$109
-
kW-mo/yr
TOTAL RECOMMENDED $19,604 $25,499 $17,415
214,242
kWh
$2,189
-
kW-mo/yr
TOTAL IMPLEMENTED $16,474 $18,491 $14,640
180,245
kWh
$1,834
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs