ITAC Assessment: ND0354
ITAC logo
ITAC Assessment: ND0354
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Brass Plumbing Fixtures
NAICS
n/a
SIC 3432: Plumbing Fixture Fittings and Trim
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 164,644
ft2
Annual Production 7,000,000
lb
Production Hrs. Annual 4,463
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $233,994 14,242,673
kWh
Electricity Demand $446,750 39,396
kW-mo/yr
Natural Gas $164,986 40,326
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,816 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,671

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $355 $240 $355
21,688
kWh
- - - - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $415 $660 $61
3,810
kWh
$59
-
kW-mo/yr
- - - $175 $120
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,533 $14,644 $720
43,669
kWh
$1,813
-
kW-mo/yr
- - - - -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,145 $2,970 $319
19,343
kWh
$2,164
-
kW-mo/yr
- $(-338.0)
-
MMBtu
- - -
05 2.4221: Install compressor air intakes in coolest locations $1,506 $300 $778
47,186
kWh
$728
-
kW-mo/yr
- - - - -
06 2.4151: Develop a repair/replace policy $8,446 $27,572 $1,741
105,803
kWh
$6,705
-
kW-mo/yr
- - - - -
07 3.4151: Minimize water usage $2,685 $6,840 - - - - $2,685
-
Tgal
- -
08 4.821: Pay bills on time to avoid late fees $1,731 - - - $1,731 - - - -
TOTAL RECOMMENDED $19,816 $53,226 $3,974
241,499
kWh
$11,469
-
kW-mo/yr
$1,731 $(-338.0)
-
MMBtu
$2,685
-
Tgal
$175 $120
TOTAL IMPLEMENTED $17,671 $50,256 $3,655
222,156
kWh
$9,305
-
kW-mo/yr
$1,731 - $2,685
-
Tgal
$175 $120
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs