Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Abrasives and Air Filters
NAICS
n/a
SIC 3291: Abrasive Products
Sales Range $10
M
to 50
M
# of Employees 139
Plant Area 200,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,290
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $180,917 2,915,299
kWh
Electricity Demand $81,009 10,485
kW-mo/yr
Natural Gas $176,139 44,333
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,218 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,331

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,237 $10,801 $1,472
24,912
kWh
$765
-
kW-mo/yr
- - - - -
02 2.7135: Install occupancy sensors $573 $600 $425
6,741
kWh
$148
-
kW-mo/yr
- - - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,205 $11,337 $1,201
19,343
kWh
$419
-
kW-mo/yr
- - $975 - $1,610
04 2.4221: Install compressor air intakes in coolest locations $3,489 $300 $2,970
47,773
kWh
$519
-
kW-mo/yr
- - - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,107 $140 $1,107
17,878
kWh
- - - - - -
06 2.4151: Develop a repair/replace policy $1,117 $1,714 $828
13,482
kWh
$289
-
kW-mo/yr
- - - - -
07 2.2443: Re-use or recycle hot or cold process exhaust air $4,286 $8,120 - - $4,286
-
MMBtu
- - - -
08 2.3131: Reschedule plant operations or reduce load to avoid peaks $20,782 $25,000 - $20,782
-
kW-mo/yr
- - - - -
09 3.4151: Minimize water usage $1,028 $4,025 - - - $1,028
-
Tgal
- - -
10 3.4155: Meter waste water $1,127 $200 - - - $1,127
-
Tgal
- - -
11 2.8121: Apply for tax-free status for energy purchases $267 $200 - - - - - $267 -
TOTAL RECOMMENDED $40,218 $62,437 $8,003
130,129
kWh
$22,922
-
kW-mo/yr
$4,286
-
MMBtu
$2,155
-
Tgal
$975 $267 $1,610
TOTAL IMPLEMENTED $34,331 $49,692 $7,578
123,388
kWh
$22,774
-
kW-mo/yr
- $1,127
-
Tgal
$975 $267 $1,610
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs