ITAC Assessment: ND0350
ITAC logo
ITAC Assessment: ND0350
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Food wrappers
NAICS
n/a
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 80,000
ft2
Annual Production 25,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $84,527 1,889,508
kWh
Electricity Demand $19,022 4,039
kW-mo/yr
Natural Gas $39,728 10,703
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $151,175 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,920

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings By-product Production Savings
01 3.5217: Reuse / recycle/ sell paper products $63,400 $8,200 - - - - $40,000
-
lb
- - - $23,400
02 3.5131: Recycle white water $36,888 - - - - $488
-
gal
- - $36,400 - -
03 2.7314: Reduce ventilation air $15,439 $1,000 $1,849
41,325
kWh
$372
-
kW-mo/yr
$13,218
-
MMBtu
- - - - - -
04 2.7221: Lower temperature during the winter season and vice-versa $6,036 $20 - - $6,036
-
MMBtu
- - - - - -
05 2.7243: Improve air circulation with destratification fans / other methods $2,124 $4,800 $(-126.0)
(-2,931)
kWh
$(-25.0)
-
kW-mo/yr
$2,275
-
MMBtu
- - - - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $16,226 $24,870 $13,452
301,583
kWh
$2,774
-
kW-mo/yr
- - - - - - -
07 2.7111: Reduce illumination to minimum necessary levels $6,647 - $5,528
123,681
kWh
$1,119
-
kW-mo/yr
- - - - - - -
08 2.7124: Make a practice of turning off lights when not needed $2,572 $200 $2,139
47,773
kWh
$433
-
kW-mo/yr
- - - - - - -
09 2.7135: Install occupancy sensors $721 $800 $600
13,482
kWh
$121
-
kW-mo/yr
- - - - - - -
10 2.7134: Use photocell controls $190 $400 $123
2,638
kWh
$67
-
kW-mo/yr
- - - - - - -
11 2.2711: Utilize outside air instead of conditioned air for drying $120 $375 $100
2,345
kWh
$20
-
kW-mo/yr
- - - - - - -
12 2.4221: Install compressor air intakes in coolest locations $268 $200 $223
4,982
kWh
$45
-
kW-mo/yr
- - - - - - -
13 2.1311: Replace electrically-operated equipment with fossil fuel equipment $340 $400 $205
4,689
kWh
$204
-
kW-mo/yr
$(-69.0)
-
MMBtu
- - - - - -
14 2.7142: Utilize higher efficiency lamps and/or ballasts $204 $275 $56
1,172
kWh
$8
-
kW-mo/yr
- - - $96 - $44 -
TOTAL RECOMMENDED $151,175 $41,540 $24,149
540,739
kWh
$5,138
-
kW-mo/yr
$21,460
-
MMBtu
$488
-
gal
$40,000
-
lb
$96 $36,400 $44 $23,400
TOTAL IMPLEMENTED $46,920 $26,090 $22,968
514,362
kWh
$4,698
-
kW-mo/yr
$19,254
-
MMBtu
- - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs