Assessment Year | 2000 |
---|---|
Principal Product | Rubber Covered Rollers |
NAICS |
n/a
|
SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 50 |
Plant Area |
50,000
ft2
|
Annual Production | 8,364
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $53,326 | 1,205,451 |
kWh
|
$0.044 |
Electricity Demand | $17,495 | 2,586 |
kW-mo/yr
|
$6.77 |
Electricity Fees | $(-7,487.0) | - |
|
- |
Natural Gas | $80,429 | 20,790 |
MMBtu
|
$3.87 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $277,539 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,513 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.1224: Replace boiler | $4,017 | $10,000 | - | - |
$4,017
-
MMBtu
|
- | - | - | - | - | - | |
02 | 2.2511: Insulate bare equipment | $271 | $925 | - | - |
$271
-
MMBtu
|
- | - | - | - | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,914 | $3,344 |
$1,392
36,928
kWh
|
$522
-
kW-mo/yr
|
- | - | - | - | - | - | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $268 | $200 |
$232
6,155
kWh
|
$36
-
kW-mo/yr
|
- | - | - | - | - | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $524 | $385 |
$89
2,345
kWh
|
$22
-
kW-mo/yr
|
- | - | - | $204 | $209 | - | - | |
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $433 | $400 |
$348
9,086
kWh
|
$85
-
kW-mo/yr
|
- | - | - | - | - | - | - | |
07 | 4.111: Add equipment/ operators to reduce production bottleneck | $250,000 | $40,000 | - | - | - | - | - | - | - | - | $250,000 | |
08 | 3.4155: Meter waste water | $10,112 | $250 | - | - | - |
$175
-
Tgal
|
- | - | - | $9,937 | - | |
09 | 3.5218: Reuse / recycle/ sell rubber products | $10,000 | $200 | - | - | - | - |
$10,000
-
lb
|
- | - | - | - | |
TOTAL RECOMMENDED | $277,539 | $55,704 |
$2,061
54,514
kWh
|
$665
-
kW-mo/yr
|
$4,288
-
MMBtu
|
$175
-
Tgal
|
$10,000
-
lb
|
$204 | $209 | $9,937 | $250,000 | ||
TOTAL IMPLEMENTED | $5,513 | $11,910 |
$669
17,586
kWh
|
$143
-
kW-mo/yr
|
$4,288
-
MMBtu
|
- | - | $204 | $209 | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs