ITAC Assessment: ND0348
ITAC logo
ITAC Assessment: ND0348
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Rubber Covered Rollers
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 50,000
ft2
Annual Production 8,364
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $53,326 1,205,451
kWh
Electricity Demand $17,495 2,586
kW-mo/yr
Electricity Fees $(-7,487.0) -
Natural Gas $80,429 20,790
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $277,539 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,513

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
01 2.1224: Replace boiler $4,017 $10,000 - - $4,017
-
MMBtu
- - - - - -
02 2.2511: Insulate bare equipment $271 $925 - - $271
-
MMBtu
- - - - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,914 $3,344 $1,392
36,928
kWh
$522
-
kW-mo/yr
- - - - - - -
04 2.4221: Install compressor air intakes in coolest locations $268 $200 $232
6,155
kWh
$36
-
kW-mo/yr
- - - - - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $524 $385 $89
2,345
kWh
$22
-
kW-mo/yr
- - - $204 $209 - -
06 2.7447: Install vinyl strip / high speed / air curtain doors $433 $400 $348
9,086
kWh
$85
-
kW-mo/yr
- - - - - - -
07 4.111: Add equipment/ operators to reduce production bottleneck $250,000 $40,000 - - - - - - - - $250,000
08 3.4155: Meter waste water $10,112 $250 - - - $175
-
Tgal
- - - $9,937 -
09 3.5218: Reuse / recycle/ sell rubber products $10,000 $200 - - - - $10,000
-
lb
- - - -
TOTAL RECOMMENDED $277,539 $55,704 $2,061
54,514
kWh
$665
-
kW-mo/yr
$4,288
-
MMBtu
$175
-
Tgal
$10,000
-
lb
$204 $209 $9,937 $250,000
TOTAL IMPLEMENTED $5,513 $11,910 $669
17,586
kWh
$143
-
kW-mo/yr
$4,288
-
MMBtu
- - $204 $209 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs