ITAC Assessment: WV0132
ITAC logo
ITAC Assessment: WV0132
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Church Offering Envelope
NAICS
n/a
SIC 2677: Envelopes
Sales Range $5
M
to 10
M
# of Employees 90
Plant Area 40,000
ft2
Annual Production 0
pieces
Production Hrs. Annual 6,120
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,185 1,670,281
kWh
Fuel Oil #1 $18,291 3,121
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,340 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,674

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #1 Savings Water Disposal Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,146 $271 $1,146
30,481
kWh
- - -
02 2.4133: Use most efficient type of electric motors $1,302 $10,560 $1,302
34,584
kWh
- - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $179 $280 $179
4,689
kWh
- - -
04 2.4221: Install compressor air intakes in coolest locations $754 $220 $754
19,930
kWh
- - -
05 2.7241: Install outside air damper / economizer on hvac unit $1,874 $2,420 $1,874
49,531
kWh
- - -
06 2.2414: Use waste heat from hot flue gases to preheat $838 $1,755 - $838
-
MMBtu
- -
07 2.2437: Recover waste heat from equipment $526 $470 - $526
-
MMBtu
- -
08 2.4314: Use synthetic lubricant $81 $251 $81
2,052
kWh
- - -
09 3.4111: Use closed cycle process to minimize waste water production $1,372 $1,000 - - $1,372
-
Tgal
-
10 3.5315: Lease / purchase baler; sell cardboard to recycler $7,200 - - - - $7,200
11 3.6193: Install equipment (eg compactor) to reduce disposal costs $1,628 $11,000 - - - $1,628
12 4.511: Expand operations into unused space $3,440 $1,224 - - - $3,440
TOTAL RECOMMENDED $20,340 $29,451 $5,336
141,267
kWh
$1,364
-
MMBtu
$1,372
-
Tgal
$12,268
TOTAL IMPLEMENTED $14,674 $4,666 $4,034
106,683
kWh
- - $10,640
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #1 Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs