Assessment Year | 1998 |
---|---|
Principal Product | Church Offering Envelope |
NAICS |
n/a
|
SIC | 2677: Envelopes |
Sales Range | $5 M to 10M |
# of Employees | 90 |
Plant Area |
40,000
ft2
|
Annual Production | 0
pieces
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $63,185 | 1,670,281 |
kWh
|
$0.038 |
Fuel Oil #1 | $18,291 | 3,121 |
MMBtu
|
$5.86 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $20,340 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,674 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #1 Savings | Water Disposal Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,146 | $271 |
$1,146
30,481
kWh
|
- | - | - | |
02 | 2.4133: Use most efficient type of electric motors | $1,302 | $10,560 |
$1,302
34,584
kWh
|
- | - | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $179 | $280 |
$179
4,689
kWh
|
- | - | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $754 | $220 |
$754
19,930
kWh
|
- | - | - | |
05 | 2.7241: Install outside air damper / economizer on hvac unit | $1,874 | $2,420 |
$1,874
49,531
kWh
|
- | - | - | |
06 | 2.2414: Use waste heat from hot flue gases to preheat | $838 | $1,755 | - |
$838
-
MMBtu
|
- | - | |
07 | 2.2437: Recover waste heat from equipment | $526 | $470 | - |
$526
-
MMBtu
|
- | - | |
08 | 2.4314: Use synthetic lubricant | $81 | $251 |
$81
2,052
kWh
|
- | - | - | |
09 | 3.4111: Use closed cycle process to minimize waste water production | $1,372 | $1,000 | - | - |
$1,372
-
Tgal
|
- | |
10 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $7,200 | - | - | - | - | $7,200 | |
11 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $1,628 | $11,000 | - | - | - | $1,628 | |
12 | 4.511: Expand operations into unused space | $3,440 | $1,224 | - | - | - | $3,440 | |
TOTAL RECOMMENDED | $20,340 | $29,451 |
$5,336
141,267
kWh
|
$1,364
-
MMBtu
|
$1,372
-
Tgal
|
$12,268 | ||
TOTAL IMPLEMENTED | $14,674 | $4,666 |
$4,034
106,683
kWh
|
- | - | $10,640 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #1 Savings | Water Disposal Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs