Assessment Year | 2000 |
---|---|
Principal Product | Cabinet Doors |
NAICS |
n/a
|
SIC | 2431: Millwork |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
100,000
ft2
|
Annual Production | 1,250,000
pieces
|
Production Hrs. Annual | 2,295
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $81,773 | 1,731,243 |
kWh
|
$0.047 |
Electricity Demand | $33,166 | 7,771 |
kW-mo/yr
|
$4.27 |
Electricity Fees | $1,935 | - |
|
- |
Natural Gas | $47,361 | 9,141 |
MMBtu
|
$5.18 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $8,890 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,890 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,011 | $600 |
$1,011
21,395
kWh
|
- | - | - | - | - | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $333 | $340 |
$296
6,155
kWh
|
$171
-
kW-mo/yr
|
- |
$(-134.0)
-
MMBtu
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $916 | $720 |
$187
4,103
kWh
|
$23
-
kW-mo/yr
|
- | - | $467 | $239 | |
04 | 2.4151: Develop a repair/replace policy | $2,703 | $10,006 |
$1,813
38,394
kWh
|
$890
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $1,992 | $900 |
$1,772
37,515
kWh
|
$220
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.8121: Apply for tax-free status for energy purchases | $1,935 | $250 | - | - | $1,935 | - | - | - | |
TOTAL RECOMMENDED | $8,890 | $12,816 |
$5,079
107,562
kWh
|
$1,304
-
kW-mo/yr
|
$1,935 |
$(-134.0)
-
MMBtu
|
$467 | $239 | ||
TOTAL IMPLEMENTED | $8,890 | $12,816 |
$5,079
107,562
kWh
|
$1,304
-
kW-mo/yr
|
$1,935 |
$(-134.0)
-
MMBtu
|
$467 | $239 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs