Assessment Year | 1992 |
---|---|
Principal Product | FERRITE COMPONENTS |
NAICS |
n/a
|
SIC | 3264: Porcelain Electrical Supplies |
Sales Range | $10 M to 50M |
# of Employees | 480 |
Plant Area |
n/a
|
Annual Production | 40,500,000
lb
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,654,533 | 50,656,507 |
kWh
|
$0.033 |
Natural Gas | $541,351 | 288,716 |
MMBtu
|
$1.88 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $61,757 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $32,213 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $15,101 | $1,770 |
$15,101
-
kWh
|
- | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,027 | - |
$1,027
34,291
kWh
|
- | - | |
03 | 2.4239: Eliminate or reduce compressed air usage | $4,819 | $738 |
$4,819
212,192
kWh
|
- | - | |
04 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $9,315 | $18,000 |
$9,315
408,851
kWh
|
- | - | |
05 | 2.2511: Insulate bare equipment | $29,544 | $808 | - |
$29,544
-
MMBtu
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,951 | - |
$2,859
126,026
kWh
|
- | $(-908.0) | |
TOTAL RECOMMENDED | $61,757 | $21,316 |
$33,121
781,360
kWh
|
$29,544
-
MMBtu
|
$(-908.0) | ||
TOTAL IMPLEMENTED | $32,213 | $20,508 |
$33,121
781,360
kWh
|
- | $(-908.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs