ITAC Assessment: OK0373
ITAC logo
ITAC Assessment: OK0373
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product FERRITE COMPONENTS
NAICS
n/a
SIC 3264: Porcelain Electrical Supplies
Sales Range $10
M
to 50
M
# of Employees 480
Plant Area
n/a
Annual Production 40,500,000
lb
Production Hrs. Annual 8,568
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,654,533 50,656,507
kWh
Natural Gas $541,351 288,716
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $61,757 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,213

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3212: Optimize plant power factor $15,101 $1,770 $15,101
-
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,027 - $1,027
34,291
kWh
- -
03 2.4239: Eliminate or reduce compressed air usage $4,819 $738 $4,819
212,192
kWh
- -
04 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $9,315 $18,000 $9,315
408,851
kWh
- -
05 2.2511: Insulate bare equipment $29,544 $808 - $29,544
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,951 - $2,859
126,026
kWh
- $(-908.0)
TOTAL RECOMMENDED $61,757 $21,316 $33,121
781,360
kWh
$29,544
-
MMBtu
$(-908.0)
TOTAL IMPLEMENTED $32,213 $20,508 $33,121
781,360
kWh
- $(-908.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings