| Assessment Year | 1999 |
|---|---|
| Principal Product | Cable Reels |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 77 |
| Plant Area |
100,000
ft2
|
| Annual Production | 3,900,000
lb
|
| Production Hrs. Annual | 8,568
hrs
|
| Location (State) | Indiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $95,622 | 4,619,285 |
kWh
|
$0.021 |
| Electricity Demand | $81,389 | 10,668 |
kW-mo/yr
|
$7.63 |
| Natural Gas | $21,661 | 3,707 |
MMBtu
|
$5.84 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $17,009 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,801 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4151: Develop a repair/replace policy | $10,392 | $26,632 |
$6,699
323,564
kWh
|
$2,650
-
kW-mo/yr
|
- | - | - | - | - | $1,043 | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $455 | $550 |
$308
14,947
kWh
|
$147
-
kW-mo/yr
|
- | - | - | - | - | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $172 | $100 |
$172
8,206
kWh
|
- | - | - | - | - | - | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $(-44.0) | $640 |
$82
4,103
kWh
|
$42
-
kW-mo/yr
|
- | - | - | $(-308.0) | $140 | - | |
| 05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $264 | $480 |
$174
8,499
kWh
|
$310
-
kW-mo/yr
|
- |
$(-220.0)
-
MMBtu
|
- | - | - | - | |
| 06 | 4.611: Begin a practice of predictive / preventative maintenance | $160 | - | - | - | - | - | - | $160 | - | - | |
| 07 | 4.821: Pay bills on time to avoid late fees | $2,469 | - | - | - | $2,469 | - | - | - | - | - | |
| 08 | 4.821: Pay bills on time to avoid late fees | $1,228 | $150 | - | - | - | - |
$1,228
-
Tgal
|
- | - | - | |
| 09 | 2.3212: Optimize plant power factor | $1,913 | $9,330 | - | - | $1,913 | - | - | - | - | - | |
| TOTAL RECOMMENDED | $17,009 | $37,882 |
$7,435
359,319
kWh
|
$3,149
-
kW-mo/yr
|
$4,382 |
$(-220.0)
-
MMBtu
|
$1,228
-
Tgal
|
$(-148.0) | $140 | $1,043 | ||
| TOTAL IMPLEMENTED | $2,801 | $100 |
$172
8,206
kWh
|
- | $2,469 | - | - | $160 | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs