| Assessment Year | 1999 |
|---|---|
| Principal Product | Rubber Seals |
| NAICS |
n/a
|
| SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 225 |
| Plant Area |
60,000
ft2
|
| Annual Production | 750,000,000
lb
|
| Production Hrs. Annual | 6,864
hrs
|
| Location (State) | Indiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $346,833 | 9,646,835 |
kWh
|
$0.036 |
| Electricity Demand | $182,185 | 16,856 |
kW-mo/yr
|
$10.81 |
| Natural Gas | $54,546 | 9,434 |
MMBtu
|
$5.78 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $11,288 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $945 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $278 | $120 |
$278
16,120
kWh
|
- | - | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $289 | $480 |
$69
4,103
kWh
|
$60
-
kW-mo/yr
|
- | $160 | |
| 03 | 2.7135: Install occupancy sensors | $1,986 | $1,600 |
$1,058
61,254
kWh
|
$928
-
kW-mo/yr
|
- | - | |
| 04 | 2.1121: Use insulation in furnaces to facilitate heating / cooling | $318 | $272 |
$35
2,052
kWh
|
$19
-
kW-mo/yr
|
$264
-
MMBtu
|
- | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $506 | $800 |
$354
20,516
kWh
|
$152
-
kW-mo/yr
|
- | - | |
| 06 | 2.6218: Turn off equipment when not in use | $60 | $87 |
$60
2,052
kWh
|
- | - | - | |
| 07 | 2.2514: Cover open tanks | $292 | $400 |
$139
8,206
kWh
|
$153
-
kW-mo/yr
|
- | - | |
| 08 | 2.4151: Develop a repair/replace policy | $7,559 | $18,073 |
$3,610
208,968
kWh
|
$3,949
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $11,288 | $21,832 |
$5,603
323,271
kWh
|
$5,261
-
kW-mo/yr
|
$264
-
MMBtu
|
$160 | ||
| TOTAL IMPLEMENTED | $945 | $959 |
$442
24,327
kWh
|
$79
-
kW-mo/yr
|
$264
-
MMBtu
|
$160 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs