ITAC Assessment: ND0331
ITAC logo
ITAC Assessment: ND0331
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Orthopedic Products
NAICS
n/a
SIC 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies
Sales Range $5
M
to 10
M
# of Employees 110
Plant Area 36,800
ft2
Annual Production 2,000,000
pieces
Production Hrs. Annual 2,250
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $71,863 1,358,734
kWh
Electricity Demand $20,320 4,761
kW-mo/yr
Natural Gas $9,441 1,831
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,790 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,336

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.7135: Install occupancy sensors $1,714 $1,600 $1,349
28,429
kWh
$365
-
kW-mo/yr
- - - -
02 2.4226: Use / purchase optimum sized compressor $1,675 $500 $1,675
35,463
kWh
- - - - -
03 2.4151: Develop a repair/replace policy $992 $2,732 $753
15,826
kWh
$239
-
kW-mo/yr
- - - -
04 2.7144: Install spectral reflectors / delamp $899 $300 $713
15,240
kWh
$186
-
kW-mo/yr
- - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,077 $220 $1,077
22,860
kWh
- - - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $532 $595 $339
7,327
kWh
$42
-
kW-mo/yr
- - $151 -
07 2.4221: Install compressor air intakes in coolest locations $372 $200 $358
7,620
kWh
$14
-
kW-mo/yr
- - - -
08 2.6218: Turn off equipment when not in use $61 $45 $61
1,172
kWh
- - - - -
09 3.5316: Contract a wood pallet recycling company $360 $360 - - - - $360 -
10 2.8114: Change rate schedules or other changes in utility service $1,533 $80 - - - $1,397
-
MMBtu
- $136
-
Tgal
11 2.8114: Change rate schedules or other changes in utility service $575 $200 - - $575 - - -
TOTAL RECOMMENDED $9,790 $6,832 $6,325
133,937
kWh
$846
-
kW-mo/yr
$575 $1,397
-
MMBtu
$511 $136
-
Tgal
TOTAL IMPLEMENTED $2,336 $880 $1,790
38,100
kWh
$186
-
kW-mo/yr
- - $360 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs