ITAC Assessment: ND0321
ITAC logo
ITAC Assessment: ND0321
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Precision Metal Parts
NAICS
n/a
SIC 3451: Screw Machine Products
Sales Range $10
M
to 50
M
# of Employees 275
Plant Area 150,000
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 5,460
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $192,660 15,410,903
kWh
Electricity Demand $113,029 13,273
kW-mo/yr
Electricity Fees $17,142 -
Natural Gas $30,060 7,554
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $118,020 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $109,364

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 4.222: Purchase re-conditioned material instead of new $103,932 - $(-4,810.0)
(-115,182)
kWh
$(-2,155.0)
-
kW-mo/yr
- - - - - $110,897
02 2.4221: Install compressor air intakes in coolest locations $2,787 $3,000 $1,839
50,703
kWh
$948
-
kW-mo/yr
- - - - - -
03 3.5113: Sell oil to recycler $3,120 $250 - - - - $3,120
-
gal
- - -
04 3.5146: Utilize a central coolant system for cleaning and reuse of metal working fluid $1,555 $7,050 - - - - $1,555
-
gal
- - -
05 2.3212: Optimize plant power factor $2,989 $12,575 - - $2,989 - - - - -
06 3.5316: Contract a wood pallet recycling company $1,378 $125 - - - - - $1,378
-
lb
- -
07 4.231: Purchase equipment instead of leasing $1,031 $3,000 - - $1,031 - - - - -
08 2.3134: Shift from daytime to nighttime operation $730 $125 - $613
-
kW-mo/yr
$117 - - - - -
09 4.811: Demolish old building to reduce tax and insurance bills $203 $203 - - - $203
-
MMBtu
- - - -
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $158 $130 $158
4,396
kWh
- - - - - - -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $137 $195 $84
879
kWh
- - - - - $53 -
TOTAL RECOMMENDED $118,020 $26,653 $(-2,729.0)
(-59,204)
kWh
$(-594.0)
-
kW-mo/yr
$4,137 $203
-
MMBtu
$4,675
-
gal
$1,378
-
lb
$53 $110,897
TOTAL IMPLEMENTED $109,364 $19,880 $(-4,652.0)
(-110,786)
kWh
$(-1,542.0)
-
kW-mo/yr
$3,106 - $1,555
-
gal
- - $110,897
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs