ITAC Assessment: UD0580
ITAC logo
ITAC Assessment: UD0580
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Welding wire
NAICS
n/a
SIC 3496: Miscellaneous Fabricated Wire Products
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 350,000
ft2
Annual Production 105,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $798,797 15,994,725
kWh
Electricity Demand $368,402 32,316
kW-mo/yr
Natural Gas $125,534 29,089
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,166,011 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $74,695

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Energy Savings Water Disposal Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $862,392 $1,300,000 $569,184
10,164,127
kWh
$165,528
-
kW-mo/yr
$(-608,029.0)
-
MMBtu
$735,709
-
MMBtu
- - - - - - - -
02 4.114: Add/modify equipment to improve drying process $134,400 $400,000 - - - - - - - - $134,400 - - -
03 3.4115: Recover and reuse cooling water $52,000 $140,000 - - - - $35,000
-
Tgal
- - - - $17,000 - -
04 4.423: Move product using mechanical means $39,393 $10,000 - - - - - - - - $16,800 - - $22,593
05 3.4153: Use counter current rinsing to reduce waste water $27,840 $3,500 - - - - $27,840
-
Tgal
- - - - - - -
06 2.4239: Eliminate or reduce compressed air usage $27,804 $11,744 $23,126
412,954
kWh
$4,678
-
kW-mo/yr
- - - - - - - - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $19,051 $30,337 $14,248
254,396
kWh
$4,803
-
kW-mo/yr
- - - - - - - - - -
08 3.5111: Filter and reuse hydraulic oil $1,713 $2,500 - - - - - - $492
-
gal
$(-129.0)
-
lb
- - $1,350 -
09 3.8136: Switch to a solvent that can be cleaned and re-used $1,418 - - - - - - $(-400.0)
-
gal
$1,448
-
gal
- - - $370 -
TOTAL RECOMMENDED $1,166,011 $1,898,081 $606,558
10,831,477
kWh
$175,009
-
kW-mo/yr
$(-608,029.0)
-
MMBtu
$735,709
-
MMBtu
$62,840
-
Tgal
$(-400.0)
-
gal
$1,940
-
gal
$(-129.0)
-
lb
$151,200 $17,000 $1,720 $22,593
TOTAL IMPLEMENTED $74,695 $45,581 $37,374
667,350
kWh
$9,481
-
kW-mo/yr
- - $27,840
-
Tgal
- - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Energy Savings Water Disposal Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs