ITAC Assessment: ND0301
ITAC logo
ITAC Assessment: ND0301
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Packaging Material
NAICS
n/a
SIC 2673: Plastics, Foil, and Coated Paper Bags
Sales Range $1
M
to 5
M
# of Employees 47
Plant Area 33,000
ft2
Annual Production 8,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $38,326 859,906
kWh
Electricity Demand $12,344 1,170
kW-mo/yr
Electricity Fees $984 -
Natural Gas $3,370 522
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,025,594 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,265 $1,154 n/a $621
22,860
kWh
$644
-
kW-mo/yr
- - - -
02 2.2515: Use optimum thickness insulation $113 $262 n/a - - - $113
-
MMBtu
- -
03 2.4221: Install compressor air intakes in coolest locations $315 $390 n/a $315
5,275
kWh
- - - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $102 $225 n/a $102
586
kWh
- - - - -
05 2.6218: Turn off equipment when not in use $8 $13 n/a $8
293
kWh
- - - - -
06 4.652: Replace existing equipment with more suitable substitutes $30,940 $24,000 n/a - - - - $30,940 -
07 4.451: Add additional production shift $690,453 $1,063,976 n/a - - - - $690,453 -
08 2.4133: Use most efficient type of electric motors $904 $1,280 n/a $428
15,533
kWh
$476
-
kW-mo/yr
- - - -
09 2.7447: Install vinyl strip / high speed / air curtain doors $385 $90 n/a - - - $385
-
MMBtu
- -
10 4.821: Pay bills on time to avoid late fees $1,106 $2,500 n/a - - $1,106 - - -
11 4.611: Begin a practice of predictive / preventative maintenance $4,300,000 $1,250 n/a - - - - - $4,300,000
12 2.7447: Install vinyl strip / high speed / air curtain doors $3 $4 n/a - - - $3
-
MMBtu
- -
TOTAL RECOMMENDED $5,025,594 $1,095,144 $1,474
44,547
kWh
$1,120
-
kW-mo/yr
$1,106 $501
-
MMBtu
$721,393 $4,300,000
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs