ITAC Assessment: ND0298
ITAC logo
ITAC Assessment: ND0298
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product stereo speakers
NAICS
n/a
SIC 3663: Radio and Television Broadcasting and Communications Equipment
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 130,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,405 769,344
kWh
Electricity Demand $16,431 4,048
kW-mo/yr
Natural Gas $26,675 4,525
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,461 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $5,967 $2,750 n/a $4,117
49,824
kWh
- $1,850
-
MMBtu
- - - -
02 3.4151: Minimize water usage $3,470 $11,000 n/a - - - $3,470
-
Tgal
- - -
03 4.812: Apply for investment incentives $3,020 $250 n/a - - - - - - $3,020
04 3.5311: Recover and reuse waste material $2,960 $700 n/a - - - - - $2,960
-
lb
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,325 $5,965 n/a $1,650
32,239
kWh
$675
-
kW-mo/yr
- - - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,161 $935 n/a $1,161
11,723
kWh
- - - - - -
07 2.7135: Install occupancy sensors $765 $800 n/a $765
8,792
kWh
- - - - - -
08 2.6218: Turn off equipment when not in use $628 $90 n/a $628
7,327
kWh
- - - - - -
09 2.7232: Replace existing hvac unit with high efficiency model $455 $1,100 n/a - - - - - - $455
10 2.4231: Reduce the pressure of compressed air to the minimum required $368 $20 n/a $368
4,396
kWh
- - - - - -
11 2.4221: Install compressor air intakes in coolest locations $306 $50 n/a $306
3,810
kWh
- - - - - -
12 3.8132: Use less toxic and volatile solvent substitutes $36 - n/a - - - - $36
-
gal
- -
TOTAL RECOMMENDED $21,461 $23,660 $8,995
118,111
kWh
$675
-
kW-mo/yr
$1,850
-
MMBtu
$3,470
-
Tgal
$36
-
gal
$2,960
-
lb
$3,475
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs