ITAC Assessment: ND0296
ITAC logo
ITAC Assessment: ND0296
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product HVAC equipment
NAICS
n/a
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area 73,000
ft2
Annual Production 10,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $52,607 847,597
kWh
Electricity Demand $24,069 2,965
kW-mo/yr
Electricity Fees $(-5,547.0) -
Natural Gas $36,430 7,789
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,799 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,126

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,045 $14,258 $4,720
76,202
kWh
$2,325
-
kW-mo/yr
- -
02 2.7447: Install vinyl strip / high speed / air curtain doors $1,246 $126 - - $1,246
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,097 $180 $1,097
13,189
kWh
- - -
04 2.7447: Install vinyl strip / high speed / air curtain doors $880 $854 - - $880
-
MMBtu
-
05 2.4133: Use most efficient type of electric motors $799 $1,520 $574
9,379
kWh
$225
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $231 $330 $231
1,465
kWh
- - -
07 2.4221: Install compressor air intakes in coolest locations $229 $50 $229
3,810
kWh
- - -
08 2.7447: Install vinyl strip / high speed / air curtain doors $119 $406 - - $119
-
MMBtu
-
09 2.6218: Turn off equipment when not in use $73 $93 $73
1,172
kWh
- - -
10 4.514: Re-arrange equipment layout to reduce handling costs $30,000 $25,000 - - - $30,000
11 4.513: Re-arrange equipment layout to reduce labor costs $2,080 - - - - $2,080
TOTAL RECOMMENDED $43,799 $42,817 $6,924
105,217
kWh
$2,550
-
kW-mo/yr
$2,245
-
MMBtu
$32,080
TOTAL IMPLEMENTED $2,126 $980 - - $2,126
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs