| Assessment Year | 1998 |
|---|---|
| Principal Product | HVAC equipment |
| NAICS |
n/a
|
| SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 105 |
| Plant Area |
73,000
ft2
|
| Annual Production | 10,000
pieces
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | Indiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $52,607 | 847,597 |
kWh
|
$0.062 |
| Electricity Demand | $24,069 | 2,965 |
kW-mo/yr
|
$8.12 |
| Electricity Fees | $(-5,547.0) | - |
|
- |
| Natural Gas | $36,430 | 7,789 |
MMBtu
|
$4.68 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $43,799 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,126 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,045 | $14,258 |
$4,720
76,202
kWh
|
$2,325
-
kW-mo/yr
|
- | - | |
| 02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,246 | $126 | - | - |
$1,246
-
MMBtu
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,097 | $180 |
$1,097
13,189
kWh
|
- | - | - | |
| 04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $880 | $854 | - | - |
$880
-
MMBtu
|
- | |
| 05 | 2.4133: Use most efficient type of electric motors | $799 | $1,520 |
$574
9,379
kWh
|
$225
-
kW-mo/yr
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $231 | $330 |
$231
1,465
kWh
|
- | - | - | |
| 07 | 2.4221: Install compressor air intakes in coolest locations | $229 | $50 |
$229
3,810
kWh
|
- | - | - | |
| 08 | 2.7447: Install vinyl strip / high speed / air curtain doors | $119 | $406 | - | - |
$119
-
MMBtu
|
- | |
| 09 | 2.6218: Turn off equipment when not in use | $73 | $93 |
$73
1,172
kWh
|
- | - | - | |
| 10 | 4.514: Re-arrange equipment layout to reduce handling costs | $30,000 | $25,000 | - | - | - | $30,000 | |
| 11 | 4.513: Re-arrange equipment layout to reduce labor costs | $2,080 | - | - | - | - | $2,080 | |
| TOTAL RECOMMENDED | $43,799 | $42,817 |
$6,924
105,217
kWh
|
$2,550
-
kW-mo/yr
|
$2,245
-
MMBtu
|
$32,080 | ||
| TOTAL IMPLEMENTED | $2,126 | $980 | - | - |
$2,126
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs