ITAC Assessment: OR0176
ITAC logo
ITAC Assessment: OR0176
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Glass Fiber
NAICS
n/a
SIC 3296: Mineral Wool
Sales Range $10
M
to 50
M
# of Employees 117
Plant Area
n/a
Annual Production 12,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,176,719 32,131,302
kWh
Natural Gas $530,947 392,858
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,582 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,334

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.2511: Insulate bare equipment $576 - - $576
-
MMBtu
-
02 2.2414: Use waste heat from hot flue gases to preheat $11,144 $23,450 - $11,144
-
MMBtu
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $270 - $270
7,034
kWh
- -
04 2.4133: Use most efficient type of electric motors $1,776 $2,859 $1,776
47,479
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,174 $9,100 $5,174
139,801
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,712 $2,537 $1,935
52,462
kWh
- $(-223.0)
07 2.3212: Optimize plant power factor $9,930 $21,000 $9,930
-
kWh
- -
TOTAL RECOMMENDED $30,582 $58,946 $19,085
246,776
kWh
$11,720
-
MMBtu
$(-223.0)
TOTAL IMPLEMENTED $4,334 $5,396 $3,981
106,975
kWh
$576
-
MMBtu
$(-223.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs