ITAC Assessment: ND0291
ITAC logo
ITAC Assessment: ND0291
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Printed Materials
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 86
Plant Area 44,000
ft2
Annual Production 1,000,000,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $42,869 1,147,421
kWh
Electricity Demand $9,938 3,808
kW-mo/yr
Natural Gas $14,586 2,947
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,292 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,153

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4133: Use most efficient type of electric motors $2,825 $3,400 $1,577
42,204
kWh
$1,248
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,398 $1,350 $1,391
37,222
kWh
$1,007
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,285 $348 $1,391
37,222
kWh
$894
-
kW-mo/yr
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $443 $40 $241
6,448
kWh
$202
-
kW-mo/yr
- - -
05 3.1191: Change procedures / equipment / operating conditions $306 $360 - - - - $306
06 2.1233: Analyze flue gas for proper air/fuel ratio $287 - - - $287
-
MMBtu
- -
07 2.7447: Install vinyl strip / high speed / air curtain doors $257 $96 $44
1,172
kWh
$39
-
kW-mo/yr
$174
-
MMBtu
- -
08 4.611: Begin a practice of predictive / preventative maintenance $170 - - - - $170 -
09 3.8221: Use alternatives for acids / alkaline (water, steam, abrasive) $128 $100 - - - - $128
10 2.4221: Install compressor air intakes in coolest locations $99 $100 $99
2,638
kWh
- - - -
11 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $89 $20 $44
1,172
kWh
$45
-
kW-mo/yr
- - -
12 2.6218: Turn off equipment when not in use $5 $73 - $5
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $9,292 $5,887 $4,787
128,078
kWh
$3,440
-
kW-mo/yr
$461
-
MMBtu
$170 $434
TOTAL IMPLEMENTED $8,153 $5,218 $4,502
120,458
kWh
$3,194
-
kW-mo/yr
$287
-
MMBtu
$170 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs