| Assessment Year | 1997 |
|---|---|
| Principal Product | Aircraft sheet metal assemblies |
| NAICS |
n/a
|
| SIC | 3444: Sheet Metal Work |
| Sales Range | $5 M to 10M |
| # of Employees | 80 |
| Plant Area |
120,000
ft2
|
| Annual Production | 150,000
pieces
|
| Production Hrs. Annual | 2,125
hrs
|
| Location (State) | Indiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $261,886 | 5,387,163 |
kWh
|
$0.049 |
| Electricity Demand | $98,628 | 9,584 |
kW-mo/yr
|
$10.29 |
| Natural Gas | $74,658 | 13,682 |
MMBtu
|
$5.46 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $51,339 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7447: Install vinyl strip / high speed / air curtain doors | $37,542 | $3,781 | n/a | - | - |
$37,542
-
MMBtu
|
- | - |
| 02 | 4.122: Develop standard procedures to improve internal yields | $8,300 | $6,000 | n/a | - | - | - | - | $8,300 |
| 03 | 3.5313: Increase amount of waste recovered for resale | $1,532 | $1,000 | n/a | - | - | - |
$1,532
-
gal
|
- |
| 04 | 2.4133: Use most efficient type of electric motors | $1,543 | $8,240 | n/a |
$1,543
30,481
kWh
|
- | - | - | - |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $588 | $440 | n/a |
$290
2,638
kWh
|
$298
-
kW-mo/yr
|
- | - | - |
| 06 | 2.2514: Cover open tanks | $568 | $55 | n/a | - | - |
$568
-
MMBtu
|
- | - |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $564 | $1,051 | n/a |
$278
12,016
kWh
|
$286
-
kW-mo/yr
|
- | - | - |
| 08 | 2.4221: Install compressor air intakes in coolest locations | $226 | $260 | n/a |
$226
4,396
kWh
|
- | - | - | - |
| 09 | 2.7135: Install occupancy sensors | $189 | $600 | n/a |
$189
4,103
kWh
|
- | - | - | - |
| 10 | 2.7447: Install vinyl strip / high speed / air curtain doors | $137 | $163 | n/a | - | - |
$137
-
MMBtu
|
- | - |
| 11 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $118 | $220 | n/a |
$118
2,345
kWh
|
- | - | - | - |
| 12 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $26 | $20 | n/a |
$26
586
kWh
|
- | - | - | - |
| 13 | 2.6218: Turn off equipment when not in use | $6 | $20 | n/a |
$6
293
kWh
|
- | - | - | - |
| TOTAL RECOMMENDED | $51,339 | $21,850 |
$2,676
56,858
kWh
|
$584
-
kW-mo/yr
|
$38,247
-
MMBtu
|
$1,532
-
gal
|
$8,300 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs