| Assessment Year | 1997 |
|---|---|
| Principal Product | Dimensional Lumber |
| NAICS |
n/a
|
| SIC | 2426: Hardwood Dimension and Flooring Mills |
| Sales Range | $5 M to 10M |
| # of Employees | 56 |
| Plant Area |
19,000
ft2
|
| Annual Production | 12,000,000
lb
|
| Production Hrs. Annual | 4,896
hrs
|
| Location (State) | West Virginia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $175,535 | 2,601,407 |
kWh
|
$0.067 |
| Electricity Fees | $378 | - |
|
- |
| Natural Gas | $12,986 | 1,698 |
MMBtu
|
$7.65 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $368,622 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | By-product Production Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $2,723 | $17,067 |
$2,723
63,306
kWh
|
- | - | - | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $6,750 | $485 |
$6,750
157,093
kWh
|
- | - | - | |
| 03 | 2.6218: Turn off equipment when not in use | $2,378 | - |
$2,378
55,100
kWh
|
- | - | - | |
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,850 | $35,000 |
$7,850
182,591
kWh
|
- | - | - | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $958 | $12 |
$958
22,274
kWh
|
- | - | - | |
| 06 | 2.2437: Recover waste heat from equipment | $1,621 | $485 | - |
$1,621
-
MMBtu
|
- | - | |
| 07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,218 | $1,680 | - |
$2,218
-
MMBtu
|
- | - | |
| 08 | 3.6192: Use a less expensive method of waste removal | $33,194 | $100 | - | - | - | $33,194 | |
| 09 | 3.6192: Use a less expensive method of waste removal | $39,600 | - | - | - | - | $39,600 | |
| 10 | 4.432: Cross-train personnel to avoid lost time | $271,330 | $4,000 |
$(-15,764.0)
(-366,647)
kWh
|
- | $287,094 | - | |
| TOTAL RECOMMENDED | $368,622 | $58,829 |
$4,895
113,717
kWh
|
$3,839
-
MMBtu
|
$287,094 | $72,794 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | By-product Production Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs