ITAC Assessment: UD0314
ITAC logo
ITAC Assessment: UD0314
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product STEEL ROLLERS
NAICS
n/a
SIC 3566: Speed Changers, Industrial High-Speed Drives, and Gears
Sales Range $50
M
to 100
M
# of Employees 325
Plant Area
n/a
Annual Production 7,500
ton
Production Hrs. Annual 6,600
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $590,338 12,894,490
kWh
Natural Gas $259,979 86,833
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $154,321 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $120,912

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $14,571 $25,000 $17,032
283,705
kWh
$(-2,461.0)
-
MMBtu
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $11,218 $14,000 $12,372
141,852
kWh
$(-1,154.0)
-
MMBtu
-
03 2.7492: Use proper thickness of insulation on building envelope $3,489 $8,000 - $3,489
-
MMBtu
-
04 2.4239: Eliminate or reduce compressed air usage $7,341 $6,000 $7,341
256,155
kWh
- -
05 2.6241: Reduce temperature of process equipment when on standby $7,638 - $7,638
-
kWh
- -
06 2.3191: Use demand controller or load shedder $16,450 $500 $16,450
-
kWh
- -
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $8,223 $33,000 $13,650
300,117
kWh
$(-5,427.0)
-
MMBtu
-
08 2.1311: Replace electrically-operated equipment with fossil fuel equipment $83,411 $150,000 $111,500
1,000,293
kWh
$(-18,089.0)
-
MMBtu
$(-10,000.0)
09 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $1,980 - $1,980
89,977
kWh
- -
TOTAL RECOMMENDED $154,321 $236,500 $187,963
2,072,099
kWh
$(-23,642.0)
-
MMBtu
$(-10,000.0)
TOTAL IMPLEMENTED $120,912 $230,000 $154,554
1,725,967
kWh
$(-23,642.0)
-
MMBtu
$(-10,000.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs