ITAC Assessment: ND0280
ITAC logo
ITAC Assessment: ND0280
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product balance shafts, torsional dampers
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 241
Plant Area 120,000
ft2
Annual Production 4,580,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $334,055 9,750,293
kWh
Electricity Demand $218,837 22,548
kW-mo/yr
Natural Gas $86,210 18,207
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $191,790 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,361

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
01 4.521: Clear and rent existing space $160,000 $5,000 - - - - $160,000 -
02 2.4133: Use most efficient type of electric motors $10,439 $8,055 $7,080
206,917
kWh
$3,359
-
kW-mo/yr
- - - -
03 3.3131: Use evaporation to concentrate material $6,707 $10,000 - - - $6,707
-
gal
- -
04 4.421: Modify current incentive program $5,000 $176 - - - - $5,000 -
05 2.2437: Recover waste heat from equipment $3,321 $2,180 - - $3,321
-
MMBtu
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,854 $520 $1,854
54,220
kWh
- - - - -
07 2.7447: Install vinyl strip / high speed / air curtain doors $1,372 $220 - - $1,372
-
MMBtu
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $606 $1,566 $606
10,258
kWh
- - - - -
09 2.1311: Replace electrically-operated equipment with fossil fuel equipment $948 $1,500 - - - - $948 -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $745 $1,160 $745
6,741
kWh
- - - - -
11 2.4221: Install compressor air intakes in coolest locations $420 $300 $420
12,309
kWh
- - - - -
12 2.7135: Install occupancy sensors $268 $200 $268
7,913
kWh
- - - - -
13 3.5316: Contract a wood pallet recycling company $90 - - - - - - $90
14 2.6218: Turn off equipment when not in use $20 $50 $20
586
kWh
- - - - -
TOTAL RECOMMENDED $191,790 $30,927 $10,993
298,944
kWh
$3,359
-
kW-mo/yr
$4,693
-
MMBtu
$6,707
-
gal
$165,948 $90
TOTAL IMPLEMENTED $19,361 $10,537 $9,540
271,395
kWh
$3,359
-
kW-mo/yr
$1,372
-
MMBtu
- $5,000 $90
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs