Assessment Year | 1997 |
---|---|
Principal Product | balance shafts, torsional dampers |
NAICS |
n/a
|
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $10 M to 50M |
# of Employees | 241 |
Plant Area |
120,000
ft2
|
Annual Production | 4,580,000
pieces
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $334,055 | 9,750,293 |
kWh
|
$0.034 |
Electricity Demand | $218,837 | 22,548 |
kW-mo/yr
|
$9.71 |
Natural Gas | $86,210 | 18,207 |
MMBtu
|
$4.73 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $191,790 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,361 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 4.521: Clear and rent existing space | $160,000 | $5,000 | - | - | - | - | $160,000 | - | |
02 | 2.4133: Use most efficient type of electric motors | $10,439 | $8,055 |
$7,080
206,917
kWh
|
$3,359
-
kW-mo/yr
|
- | - | - | - | |
03 | 3.3131: Use evaporation to concentrate material | $6,707 | $10,000 | - | - | - |
$6,707
-
gal
|
- | - | |
04 | 4.421: Modify current incentive program | $5,000 | $176 | - | - | - | - | $5,000 | - | |
05 | 2.2437: Recover waste heat from equipment | $3,321 | $2,180 | - | - |
$3,321
-
MMBtu
|
- | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,854 | $520 |
$1,854
54,220
kWh
|
- | - | - | - | - | |
07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,372 | $220 | - | - |
$1,372
-
MMBtu
|
- | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $606 | $1,566 |
$606
10,258
kWh
|
- | - | - | - | - | |
09 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $948 | $1,500 | - | - | - | - | $948 | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $745 | $1,160 |
$745
6,741
kWh
|
- | - | - | - | - | |
11 | 2.4221: Install compressor air intakes in coolest locations | $420 | $300 |
$420
12,309
kWh
|
- | - | - | - | - | |
12 | 2.7135: Install occupancy sensors | $268 | $200 |
$268
7,913
kWh
|
- | - | - | - | - | |
13 | 3.5316: Contract a wood pallet recycling company | $90 | - | - | - | - | - | - | $90 | |
14 | 2.6218: Turn off equipment when not in use | $20 | $50 |
$20
586
kWh
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $191,790 | $30,927 |
$10,993
298,944
kWh
|
$3,359
-
kW-mo/yr
|
$4,693
-
MMBtu
|
$6,707
-
gal
|
$165,948 | $90 | ||
TOTAL IMPLEMENTED | $19,361 | $10,537 |
$9,540
271,395
kWh
|
$3,359
-
kW-mo/yr
|
$1,372
-
MMBtu
|
- | $5,000 | $90 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs