ITAC Assessment: ND0279
ITAC logo
ITAC Assessment: ND0279
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Target Missiles
NAICS
n/a
SIC 3489: Ordnance and Accessories, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 149
Plant Area 82,000
ft2
Annual Production 24
pieces
Production Hrs. Annual 2,625
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $102,364 2,235,932
kWh
Electricity Demand $24,670 6,920
kW-mo/yr
Natural Gas $5,961 930
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $76,327 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,281

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7232: Replace existing hvac unit with high efficiency model $25,063 $75,000 - - $25,063 - - - - - -
02 2.4226: Use / purchase optimum sized compressor $19,775 $7,000 $11,673
254,982
kWh
$3,102
-
kW-mo/yr
- - - - $5,000 - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $7,005 $36,799 $5,043
109,027
kWh
$1,962
-
kW-mo/yr
- - - - - - -
04 2.7447: Install vinyl strip / high speed / air curtain doors $6,570 $1,500 $6,570
142,438
kWh
- - - - - - - -
05 2.2437: Recover waste heat from equipment $3,396 $1,000 $2,684
58,617
kWh
$712
-
kW-mo/yr
- - - - - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,092 $1,388 $436
7,620
kWh
- - - - - $324 - $332
07 2.4221: Install compressor air intakes in coolest locations $872 $400 $684
14,947
kWh
$188
-
kW-mo/yr
- - - - - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $405 $1,140 $322
7,034
kWh
$83
-
kW-mo/yr
- - - - - - -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $196 $100 $161
3,517
kWh
$35
-
kW-mo/yr
- - - - - - -
10 2.6218: Turn off equipment when not in use $174 - $174
3,810
kWh
- - - - - - - -
11 2.7135: Install occupancy sensors $173 $200 $173
3,810
kWh
- - - - - - - -
12 3.4111: Use closed cycle process to minimize waste water production $8,276 $10,000 - - - $8,276
-
Tgal
- - - - -
13 3.5316: Contract a wood pallet recycling company $450 - - - - - - $450
-
lb
- - -
14 3.1191: Change procedures / equipment / operating conditions $300 $200 - - - - $300
-
gal
- - - -
15 2.8114: Change rate schedules or other changes in utility service $2,580 - - - - - - - - $2,580 -
TOTAL RECOMMENDED $76,327 $134,727 $27,920
605,802
kWh
$6,082
-
kW-mo/yr
$25,063 $8,276
-
Tgal
$300
-
gal
$450
-
lb
$5,324 $2,580 $332
TOTAL IMPLEMENTED $15,281 $46,799 $5,043
109,027
kWh
$1,962
-
kW-mo/yr
- $8,276
-
Tgal
- - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs