ITAC Assessment: ND0276
ITAC logo
ITAC Assessment: ND0276
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Automotive parts
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 174
Plant Area 170,000
ft2
Annual Production 5,200,000
pieces
Production Hrs. Annual 6,384
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $271,760 11,288,101
kWh
Electricity Demand $190,837 22,987
kW-mo/yr
Natural Gas $49,210 13,672
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,774 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.4221: Install compressor air intakes in coolest locations $2,118 $600 n/a $2,118
87,925
kWh
- - -
02 2.2437: Recover waste heat from equipment $16,897 $10,000 n/a - - $16,897
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $670 $1,053 n/a $406
16,120
kWh
$264
-
kW-mo/yr
- -
04 2.6218: Turn off equipment when not in use $5 $17 n/a $5
293
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $158 $450 n/a $158
1,758
kWh
- - -
06 4.811: Demolish old building to reduce tax and insurance bills $9,928 $150 n/a - - - $9,928
07 2.7444: Close holes and openings in building such as broken windows $1,531 $240 n/a $673
27,843
kWh
- $858
-
MMBtu
-
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,377 $340 n/a $1,377
57,151
kWh
- - -
09 2.4133: Use most efficient type of electric motors $3,090 $2,400 n/a $2,208
52,755
kWh
$882
-
kW-mo/yr
- -
TOTAL RECOMMENDED $35,774 $15,250 $6,945
243,845
kWh
$1,146
-
kW-mo/yr
$17,755
-
MMBtu
$9,928
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs