ITAC Assessment: ND0272
ITAC logo
ITAC Assessment: ND0272
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Machined Auto Parts
NAICS
n/a
SIC 3514:
Sales Range $50
M
to 100
M
# of Employees 288
Plant Area 100,000
ft2
Annual Production 5,000,000
pieces
Production Hrs. Annual 7,956
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $384,450 7,846,718
kWh
Electricity Demand $220,188 20,640
kW-mo/yr
Natural Gas $50,840 10,721
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $68,696 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $68,696

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $98 $74 $39
1,465
kWh
$59
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $288 $800 $115
3,810
kWh
$173
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $134 $600 $134
4,396
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $2,755 $500 $2,755
91,442
kWh
- -
05 2.2437: Recover waste heat from equipment $806 $400 - - $806
-
MMBtu
06 2.7444: Close holes and openings in building such as broken windows $153 $133 - - $153
-
MMBtu
07 2.4133: Use most efficient type of electric motors $15,578 $5,195 $6,231
137,749
kWh
$9,347
-
kW-mo/yr
-
08 2.8114: Change rate schedules or other changes in utility service $40,340 $7,000 - $40,340
-
kW-mo/yr
-
09 2.3131: Reschedule plant operations or reduce load to avoid peaks $8,544 $8,000 - $8,544
-
kW-mo/yr
-
TOTAL RECOMMENDED $68,696 $22,702 $9,274
238,862
kWh
$58,463
-
kW-mo/yr
$959
-
MMBtu
TOTAL IMPLEMENTED $68,696 $22,702 $9,274
238,862
kWh
$58,463
-
kW-mo/yr
$959
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs