ITAC Assessment: ND0270
ITAC logo
ITAC Assessment: ND0270
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Machined metal products
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area 37,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,016 385,404
kWh
Natural Gas $8,694 2,035
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,358 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7444: Close holes and openings in building such as broken windows $227 $245 - $227
-
MMBtu
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $360 $900 $360
6,448
kWh
- - -
03 2.7447: Install vinyl strip / high speed / air curtain doors $61 $170 - $61
-
MMBtu
- -
04 2.4131: Size electric motors for peak operating efficiency $250 $700 $250
5,862
kWh
- - -
05 2.4221: Install compressor air intakes in coolest locations $149 $400 $149
2,638
kWh
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $380 $200 $380
6,155
kWh
- - -
07 2.6218: Turn off equipment when not in use $131 - $131
3,224
kWh
- - -
08 2.8112: Combine utility meters $720 $2,880 - - $720 -
09 4.811: Demolish old building to reduce tax and insurance bills $134 $160 - - $134 -
10 2.7491: Insulate glazing, walls, ceilings, and roofs $765 $982 - $765
-
MMBtu
- -
11 3.5316: Contract a wood pallet recycling company $72 - - - - $72
12 3.8132: Use less toxic and volatile solvent substitutes $109 - - - - $109
TOTAL RECOMMENDED $3,358 $6,637 $1,270
24,327
kWh
$1,053
-
MMBtu
$854 $181
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs